Under environmental reviewIndustry · Bilaspur, Chhattisgarh

Iron Ore Beneficiation Plant (1x1.0 MTPA), Pelletization Plant (1x0.6 MTPA) with Coal Gasifier (5x7000 m3/hr), Sponge Iron Plant (2x350 TPD DRI Kilns), Induction Furnaces (3x20T) with matching LRF & CCM, Hot Rolling Mill (0.2 MTPA) with 1x15 TPH oil fired Re-heating Furnace (optional) alongwith 34 MW Capacity Captive Power Plant (16 MW WHRB based + 18 MW AFBC based)

Iron Ore Beneficiation Plant (1x1.0 MTPA), Pelletization Plant (1x0.6 MTPA) with Coal Gasifier (5x7000 m3/hr), Sponge Iron Plant (2x350 TPD DRI Kilns), Induction Furnaces (3x20T) with matching LRF & CCM, Hot Rolling Mill (0.2 MTPA) with 1x15 TPH oil fired Re-heating Furnace (optional) alongwith 34 MW Capacity Captive Power Plant (16 MW WHRB based + 18 MW AFBC based) is a proposed industrial project in Newara, Takhatpur, Bilaspur, Chhattisgarh. The site covers 60 acres. Its stated project cost is ₹455 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 12 May 2023).

See it on the live map All projects in Bilaspur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed installation of Iron Ore Beneficiation Plant (1x1.0 MTPA), Pelletization Plant (1x0.6 MTPA) with Coal Gasifier (5x7000 m3/hr), Sponge Iron Plant (2x350 TPD DRI Kilns), Induction Furnaces (3x20T) with matching LRF & CCM, Hot Rolling Mill (0.2 MTPA) with 1x15 TPH oil fired Re-heating Furnace (optional) alongwith 34 MW Capacity Captive Power Plant (16 MW WHRB based + 18 MW AFBC based)
StatusUnder environmental review
Status since12 May 2023
Application filed12 May 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantCpcbl Steels and Power Private Limited
Land area60 acres (24.3 ha)
Project cost₹455 crore
Village / localityNewara
Taluk / tehsilTakhatpur
DistrictBilaspur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00080

In context

47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 60 acres, this one is smaller than 66% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Newara, Takhatpur, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Cpcbl Steels and Power Private Limited in Bilaspur

All 4 Cpcbl Steels and Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.