Quick answers
What is this project?
Greenfield Project comprising of establishment of 200 KLPD Grain based Distillery Plant is a proposed industrial project in Sandi, Arang, Raipur, Chhattisgarh. The site covers 102.9 acres.
Who is building it?
The applicant is Solus Fuels and Minerals Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Nov 2023), as of 27 Nov 2026.
Where is it?
In Sandi, Arang, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹120 crore and a site of 102.9 acres.
When was it filed?
The application was filed on 23 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Project comprising of establishment of 200 KLPD Grain based Distillery Plant
Project details
| Official title | Greenfield Project comprising of establishment of 200 KLPD Grain based Distillery Plant along with 6.0 MW Cogen. Power Plant |
|---|---|
| Status | Cleared for impact study |
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Solus Fuels and Minerals Private Limited |
| Land area | 102.9 acres (41.6 ha) |
| Project cost | ₹120 crore |
| Village / locality | Sandi |
| Taluk / tehsil | Arang |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00084 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 (this page) | Cleared for impact study | 102.9 acres | ₹120 crore |
| New project filed 7 Jul 2023 | Environmental approval granted | 102.9 acres | ₹120 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 102.9 acres, this one is larger than 83% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sandi, Arang, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project comprising of establishment of 200 KLPD Grain based… — environmental approval granted, 0 m away
- Expansion of Grain based distillery from 360 KLPD Ethanol plant (1×200 KLPD +… — cleared for impact study, 3.1 km away
- Grain based Distillery plant capacity of 1 x 200 KLPD & 1 X 160 KLPD — lapsed, 3.1 km away
- Sujeet Singh — environmental approval granted, 5.8 km away
- Sujeet Singh — cleared for impact study, 5.8 km away
- M/s Suraj Construction Proprietor- Alkesh Dwivedi — under environmental review, 6.6 km away
- M/s Suraj Construction Proprietor- Alkesh Dwivedi — under environmental review, 6.6 km away
- Dilharan Lal Yadav — environmental approval granted, 7.7 km away