Quick answers
What is this project?
Expansion of production facilities of Induction Furnace with CCM from existing 59,500 TPA to 289,400 TPA MS Billets by M/s. Agrawal Channel Mills Private Ltd is a proposed industrial project in Siltara, Raipur, Chhattisgarh. The site covers 5.9 acres.
Who is building it?
The applicant is Agrawal Channel Mills Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 Nov 2023), as of 27 Nov 2026.
Where is it?
In Siltara, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹26.9 crore and a site of 5.9 acres.
When was it filed?
The application was filed on 7 Oct 2023.
Project details
| Official title | Expansion of production facilities of Induction Furnace with CCM from existing 59,500 TPA to 289,400 TPA MS Billets along with total Rerolled Steel Production capacity of 272,000 TPA, out of which 242,000 TPA through Hot Charging and 30,000 TPA through existing BRF based rolling mill located at Plot No.34-35, Phase-II, Industrial Growth Centre Siltara, Raipur, Chhattisgarh by M/s. Agrawal Channel Mills Private Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 28 Nov 2023 |
| Application filed | 7 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Agrawal Channel Mills Private Limited |
| Land area | 5.9 acres (2.4 ha) |
| Project cost | ₹26.9 crore |
| Village / locality | Siltara |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00263 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 8 Mar 2025 | Lapsed | 5.9 acres | ₹26.9 crore |
| Early planning filed 7 Oct 2023 (this page) | Cleared for impact study | 5.9 acres | ₹26.9 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.9 acres, this one is smaller than 72% of them.
55 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Siltara, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of production facilities of Induction Furnace with CCM from existing… — lapsed, 0 m away
- Expansion of Re-rolled Products through Rolling mill by hot charging from… — environmental approval granted, 350 m away
- Industrial project by Trimurti Re-Rollers Pvt. Ltd. — withdrawn, 450 m away
- Expansion of Manufacturing capacity Ferro Alloys from 8,000 TPA to 19,000 TPA… — environmental approval granted, 600 m away
- Transfer of Environmental Clearance from Gagan Resources Private Limited to… — environmental approval granted, 950 m away
- Transfer of EC from M/s. Saini Industries Limited to M/s. Gagan Resources… — environmental approval granted, 950 m away
- Nipl Proposal for Proposed Change in Route of Manufacturing Process for… — initial checks, 950 m away
- Industrial project by Sarwottam Strips PVT. LTD. — environmental approval granted, 1000 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.