Quick answers
What is this project?
Regularization of Re-Rolling Mill plant of 30,000 MTPA capacity, in compliance to the MoEF&CC Notification dated 20th July 2022 at Khasra No. 181/1 (Ka.), 181/1 (Kha.) & 181/1(Chha.), Village Birgaon, Tehsil Dharsiwa, District Raipur, Chhattisgarh by M/s Jekay International Track Pvt. Ltd is a proposed industrial project in Birgaon, Raipur, Chhattisgarh. The site covers 8 acres.
Who is building it?
The applicant is Jekay International Track Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 13 Mar 2023), as of 27 Nov 2026.
Where is it?
In Birgaon, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹3.5 crore and a site of 8 acres.
When was it filed?
The application was filed on 13 Mar 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Mar 2023 |
| Application filed | 13 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jekay International Track Private Limited |
| Land area | 8 acres (3.2 ha) |
| Project cost | ₹3.5 crore |
| Village / locality | Birgaon |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00266 |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8 acres, this one is smaller than 66% of them.
74 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Birgaon, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of Re-Rolling Mill plant of 25,000 MTPA & Fabricated… — cleared for impact study, 200 m away
- Regularization of Re-Rolling Mill plant of 30,000 MTPA capacity, in compliance… — withdrawn, 200 m away
- Chhattisgarh Steel Products — cleared for impact study, 400 m away
- Regularization of the existing manufacturing of Re-Rolled Products having… — more information requested, 500 m away
- R S Steel Udyog — cleared for impact study, 650 m away
- Proposed regularization of the existing Rolling Mill – 24,000 TPA Capacity as… — cleared for impact study, 700 m away
- Regularization of the existing manufacturing of Re-Rolled Products having… — cleared for impact study, 750 m away
- Regularization of the existing project of Re Rolled Product Through Induction… — more information requested, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.