Cleared for impact studyIndustry · Other, Chhattisgarh

Proposed DRI Plant (Sponge Iron 135000 TPA), WHRB 10MW, AFBC Power Plant 3.5MW, Submerged Electric Arc Furnace 7 MVA(Ferro Manganese 12600 TPA), Table top furnace (Brown Fused Alumina 10500 TPA) by M/s Shri Baba Baidnath Ispat Pvt Ltd at Sy No 339/1, 339/3, 340, 341, 348/1, 348/2, 349/1, 349/2, 349/3, 349/4, 349/5, 350/1, 350/2, 350/3, 350/4, 351/1, 359/1, 351/2, 359/2, 351/3, 359/3, 352, 353, 354, 355/1, 355/2, 356, 360, 362 and 363/2, Vill.-Gaitra & Raikheda, Teh.-Tilda, Dist.-Raipur, Chhattis

Proposed DRI Plant (Sponge Iron 135000 TPA), WHRB 10MW, AFBC Power Plant 3.5MW, Submerged Electric Arc Furnace 7 MVA(Ferro Manganese 12600 TPA), Table top furnace (Brown Fused Alumina 10500 TPA) by M/s Shri Baba Baidnath Ispat Pvt Ltd at Sy No 339/1, 339/3, 340, 341, 348/1, 348/2, 349/1, 349/2, 349/3, 349/4, 349/5, 350/1, 350/2, 350/3, 350/4, 351/1, 359/1, 351/2, 359/2, 351/3, 359/3, 352, 353, 354, 355/1, 355/2, 356, 360, 362 and 363/2, Vill.-Gaitra & Raikheda, Teh.-Tilda, Dist.-Raipur, Chhattis is a proposed industrial project in Other, Chhattisgarh. The site covers 249.4 acres. Its stated project cost is ₹75 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 3 Oct 2024).

See it on the live map All projects in Other

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since3 Oct 2024
Application filed16 Sept 2023
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantShri Baba Baidnath Ispat Private Limited
Land area249.4 acres (100.9 ha)
Project cost₹75 crore
DistrictOther
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00375

Where it is

Other, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.