One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Steel Plant consisting of I/O Benef&Pelletization plant from 3,00,000 TPA…
Project details
| Official title | Expansion of Steel Plant consisting of I/O Benef&Pelletization plant from 3,00,000 TPA to 5,00,000 TPA, Spong Iron From 90,000 TPA to2,40,000 TPA, IF with Concast From 90,000 TPA to 1,80,000 TPA, RM From 90,000 TPA to 1,80,000 TPA, CPP-WHRB from 6 MW to 18 MW, AFBC From 6 MW to 24 MW, Fly ash Brick plant of 15 Million bricks /annum (50,000 Bricks/day) along with existing Ferro Alloy plant of 2 x 9 MVA to manufacture FeSi – 12,650 TPA (or)SiMn – 28,500 TPA (Or) FeMn-37,000 TPA |
|---|---|
| Status | Cleared for impact study |
| Status since | 13 Oct 2023 |
| Application filed | 18 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Raipur Power and Steel LTD |
| Land area | 65.5 acres (26.5 ha) |
| Project cost | ₹877 crore |
| Village / locality | Rasmada |
| Taluk / tehsil | Durg |
| District | Durg |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00413 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 26 Dec 2024 | Environmental approval granted | 65.5 acres | ₹877 crore |
| Early planning filed 18 Aug 2023 (this page) | Cleared for impact study | 65.5 acres | ₹877 crore |
In context
41 applications in Durg since January 2022 are in the same category (Industry): 25 approved, 13 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 65.5 acres, this one is larger than 71% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rasmada, Durg, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Steel Plant consisting of I/O Benef&Pelletization plant from… — environmental approval granted, 0 m away
- Expansion of Steel Plant with Captive Power Plant — more information requested, 650 m away
- Expansion of Existing Steel Plant at Borai Industrial Growth Centre, Rasmada,… — cleared for impact study, 650 m away
- For Proposed "change in Submerged Electric Arc Furnace Plant Configuration… — initial checks, 650 m away
- Expansion of Induction Furnace unit (Hot Billets / MS Billets/ Ingots from… — environmental approval granted, 650 m away
- Expansion of Induction Furnace unit (Hot Billets / MS Billets/ Ingots from… — lapsed, 650 m away
- Proposed Unit for Manufacturing of Formaldehyde — environmental approval granted, 950 m away
- For Proposed "upgradation in Induction Furnaces Capacities From 2 X 10 T, 2 X… — initial checks, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.