What is Developing? Open the mapMap

Cleared for impact studyIndustry · Durg, Chhattisgarh

Expansion of Steel Plant consisting of I/O Benef&Pelletization plant from 3,00,000 TPA to 5,00,000 TPA, Spong Iron From 90,000 TPA to2,40,000 TPA, IF with Concast From 90,000 TPA to 1,80,000 TPA, RM From 90,000 TPA to 1,80,000 TPA, CPP-WHRB from 6 MW to 18 MW, AFBC From 6 MW to 24 MW, Fly ash Brick plant of 15 Million bricks /annum (50,000 Bricks/day)

Expansion of Steel Plant consisting of I/O Benef&Pelletization plant from 3,00,000 TPA to 5,00,000 TPA, Spong Iron From 90,000 TPA to2,40,000 TPA, IF with Concast From 90,000 TPA to 1,80,000 TPA, RM From 90,000 TPA to 1,80,000 TPA, CPP-WHRB from 6 MW to 18 MW, AFBC From 6 MW to 24 MW, Fly ash Brick plant of 15 Million bricks /annum (50,000 Bricks/day) is a proposed industrial project in Rasmada, Durg, Chhattisgarh. The site covers 65.5 acres. Its stated project cost is ₹877 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Oct 2023).

See it on the live map All projects in Durg

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Steel Plant consisting of I/O Benef&Pelletization plant from 3,00,000 TPA…

Project details

Official titleExpansion of Steel Plant consisting of I/O Benef&Pelletization plant from 3,00,000 TPA to 5,00,000 TPA, Spong Iron From 90,000 TPA to2,40,000 TPA, IF with Concast From 90,000 TPA to 1,80,000 TPA, RM From 90,000 TPA to 1,80,000 TPA, CPP-WHRB from 6 MW to 18 MW, AFBC From 6 MW to 24 MW, Fly ash Brick plant of 15 Million bricks /annum (50,000 Bricks/day) along with existing Ferro Alloy plant of 2 x 9 MVA to manufacture FeSi – 12,650 TPA (or)SiMn – 28,500 TPA (Or) FeMn-37,000 TPA
StatusCleared for impact study
Status since13 Oct 2023
Application filed18 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantRaipur Power and Steel LTD
Land area65.5 acres (26.5 ha)
Project cost₹877 crore
Village / localityRasmada
Taluk / tehsilDurg
DistrictDurg
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00413

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 26 Dec 2024Environmental approval granted65.5 acres₹877 crore
Early planning filed 18 Aug 2023 (this page)Cleared for impact study65.5 acres₹877 crore

In context

41 applications in Durg since January 2022 are in the same category (Industry): 25 approved, 13 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 65.5 acres, this one is larger than 71% of them.

13 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rasmada, Durg, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.