What is Developing? Open the mapMap

Environmental approval grantedIndustry · Bametara, Chhattisgarh

Greenfield Project of "Grain Based Distillery Plant of 150 KLD by M/s Unity Industries Private Limited

Greenfield Project of "Grain Based Distillery Plant of 150 KLD by M/s Unity Industries Private Limited is an approved industrial project in Borsi, Berla, Bametara, Chhattisgarh. The site covers 16 acres. Its stated project cost is ₹197.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 8 Dec 2023).

See it on the live map All projects in Bametara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield Project of "Grain Based Distillery Plant of 150 KLD by M/s Unity Industries Private Limited is an approved industrial project in Borsi, Berla, Bametara, Chhattisgarh. The site covers 16 acres.

Who is building it?

The applicant is Unity Industries Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 8 Dec 2023), as of 27 Nov 2026.

Where is it?

In Borsi, Berla, Bametara, Chhattisgarh.

How big is it?

It has a stated cost of ₹197.2 crore and a site of 16 acres.

When was it filed?

The application was filed on 21 Oct 2023.

Project details

Official titleGreenfield Project of "Grain Based Distillery Plant of 150 KLD along with Co-generation Power Plant of 3.75 MW" Located at Village- Borsi, Tehsil- Berla, District- Bemetara, Chhattishgarh by M/s Unity Industries Private Limited
StatusEnvironmental approval granted
Status since8 Dec 2023
Application filed21 Oct 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantUnity Industries Private Limited
Land area16 acres (6.5 ha)
Project cost₹197.2 crore
Village / localityBorsi
Taluk / tehsilBerla
DistrictBametara
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00437

In context

24 applications in Bametara since January 2022 are in the same category (Industry): 15 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 16 acres, this one is smaller than 87% of them.

34 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Borsi, Berla, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.