Cleared for impact studyIndustry · Bilaspur, Chhattisgarh

Greenfield steel plant comprising of DRI Kilns – 2 x 250 TPD (Sponge Iron - 1,65,000 TPA), Ferro Alloy Unit - 3 x 9 MVA (FeSi – 21,000 TPA/ FeMn – 60,000 TPA/ SiMn – 42,000 TPA/FeCr – 45,000 TPA/ Pig Iron - 72,000 TPA), Briquetting Plant (300 Kg/Hr.), WHRB based Power Plant – 2 x 7 MW, FBC based Power Plant – 1 x 12 MW & Brick Manufacturing unit (16,000 Bricks / Day)]

Greenfield steel plant comprising of DRI Kilns – 2 x 250 TPD (Sponge Iron - 1,65,000 TPA), Ferro Alloy Unit - 3 x 9 MVA (FeSi – 21,000 TPA/ FeMn – 60,000 TPA/ SiMn – 42,000 TPA/FeCr – 45,000 TPA/ Pig Iron - 72,000 TPA), Briquetting Plant (300 Kg/Hr.), WHRB based Power Plant – 2 x 7 MW, FBC based Power Plant – 1 x 12 MW & Brick Manufacturing unit (16,000 Bricks / Day)] is a proposed industrial project in Kharkena, Takhatpur, Bilaspur, Chhattisgarh. The site covers 97.7 acres. Its stated project cost is ₹351.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Jun 2024).

See it on the live map All projects in Bilaspur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield steel plant comprising of DRI Kilns – 2 x 250 TPD (Sponge Iron - 1,65,000…

Project details

Official titleEstablishment of Greenfield steel plant comprising of DRI Kilns – 2 x 250 TPD (Sponge Iron - 1,65,000 TPA), Ferro Alloy Unit - 3 x 9 MVA (FeSi – 21,000 TPA/ FeMn – 60,000 TPA/ SiMn – 42,000 TPA/FeCr – 45,000 TPA/ Pig Iron - 72,000 TPA), Briquetting Plant (300 Kg/Hr.), WHRB based Power Plant – 2 x 7 MW, FBC based Power Plant – 1 x 12 MW & Brick Manufacturing unit (16,000 Bricks / Day)]
StatusCleared for impact study
Status since13 Jun 2024
Application filed3 Jun 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantBilaspur Mining India Private Limited
Land area97.7 acres (39.5 ha)
Project cost₹351.2 crore
Village / localityKharkena
Taluk / tehsilTakhatpur
DistrictBilaspur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01114

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 12 Dec 2025Environmental approval granted97.7 acres₹351.2 crore
Early planning filed 3 Jun 2024 (this page)Cleared for impact study97.7 acres₹351.2 crore

In context

47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 97.7 acres, this one is larger than 66% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kharkena, Takhatpur, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bilaspur Mining India Private Limited in Bilaspur

All 3 Bilaspur Mining projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.