Quick answers
What is Mining project by M/s. Dilip Buildcon Limited?
This proposed mining project by M/s. Dilip Buildcon Limited is in Semipali, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh. The site covers 6.7 acres.
Who is building it?
The applicant is Dilip Buildcon Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Oct 2024), as of 27 Nov 2026.
Where is it?
In Semipali, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹28 lakh and a site of 6.7 acres.
When was it filed?
The application was filed on 21 Mar 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s. Dilip Buildcon Limited
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Oct 2024 |
| Application filed | 21 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Dilip Buildcon Limited |
| Land area | 6.7 acres (2.7 ha) |
| Project cost | ₹28 lakh |
| Village / locality | Semipali |
| Taluk / tehsil | Udaipur (Dharamjaigarh) |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site area on record |
| Our reference | WID-CG-01538 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 May 2025 | Environmental approval granted | 6.7 acres | ₹28 lakh |
| Early planning filed 21 Mar 2024 (this page) | Cleared for impact study | 6.7 acres | ₹28 lakh |
In context
230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 6.7 acres, this one is smaller than 54% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 14 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Semipali, Udaipur (Dharamjaigarh), Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Dilip Buildcon Limited — environmental approval granted, 0 m away
- M/s. Dilip Buildcon Limited -Semipali Ordinary Stone Quarry — withdrawn, 0 m away
- M/s. Dilip Buildcon Limited -Semipali Ordinary Stone Quarry — environmental approval granted, 150 m away
- Jhulanbar Ordinary Stone Mine of M/s. Sunil Kumar Agrawal (L.L.P) — environmental approval granted, 450 m away
- Durgapur II Sarya Coal Block — under forest review, 5.9 km away
- Durgapur II Sarya Coal Block — lapsed, 5.9 km away
- Re-Alignment of 4- Laning of Urga-Pathalgaon Section of Nh-130a Under… — more information requested, 6.5 km away
- Re-Alignment of 4-Laning of Urga-Pathalgaon Section of Nh-130a Under… — not approved, 6.5 km away
More from Dilip Buildcon Limited in Raigarh
- M/s. Dilip Buildcon Limited -Semipali Ordinary Stone Quarry — withdrawn
- M/s. Dilip Buildcon Limited -Semipali Ordinary Stone Quarry — environmental approval granted
4 Dilip Buildcon projects in Raigarh
All 45 Dilip Buildcon projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.