LapsedIndustry · Bilaspur, Chhattisgarh

EC Split of Existing Environmental Clearance of Expansion of Sponge Iron Plant from 2,40,000 TPA to 3,00,000 TPA and Installation of Steel Plant (2.16.000 TPA of Induction Furnace, 90,000 TPA of Rolling Mill, and 30,000 TPA of Ferro Alloys) by M/s Satya Power and Ispat Limited

EC Split of Existing Environmental Clearance of Expansion of Sponge Iron Plant from 2,40,000 TPA to 3,00,000 TPA and Installation of Steel Plant (2.16.000 TPA of Induction Furnace, 90,000 TPA of Rolling Mill, and 30,000 TPA of Ferro Alloys) by M/s Satya Power and Ispat Limited is a lapsed industrial project in Gatauri, Bilaspur, Chhattisgarh. The site covers 60 acres. Its stated project cost is ₹375 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Bilaspur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleEC Split of Existing Environmental Clearance of Expansion of Sponge Iron Plant from 2,40,000 TPA to 3,00,000 TPA and Installation of Steel Plant (2.16.000 TPA of Induction Furnace, 90,000 TPA of Rolling Mill, and 30,000 TPA of Ferro Alloys) along with Coal Washery of 14,40,000 TPA Capacity, and Captive Power Plant (44 MW: 22 MW of WHRB and 24 MW of AFBC) at Village Gatauri, Block Bilha, District Bilaspur, Chhattisgarh by M/s Satya Power and Ispat Limited
StatusLapsed
Status since29 Oct 2024
Application filed26 Aug 2024
Approval soughtEnvironmental approval
Application typeOther
SectorIndustry
ApplicantSatya Power &ispat Limited
Land area60 acres (24.3 ha)
Project cost₹375 crore
Village / localityGatauri
Taluk / tehsilBilaspur
DistrictBilaspur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01951

In context

47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 60 acres, this one is smaller than 66% of them.

18 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gatauri, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Satya Power &ispat Limited in Bilaspur

5 Satya Power &ispat projects in Bilaspur
All 7 Satya Power &ispat projects across India