Project details
| Official title | EC Split of Existing Environmental Clearance of Expansion of Sponge Iron Plant from 2,40,000 TPA to 3,00,000 TPA and Installation of Steel Plant (2.16.000 TPA of Induction Furnace, 90,000 TPA of Rolling Mill, and 30,000 TPA of Ferro Alloys) along with Coal Washery of 14,40,000 TPA Capacity, and Captive Power Plant (44 MW: 22 MW of WHRB and 24 MW of AFBC) at Village Gatauri, Block Bilha, District Bilaspur, Chhattisgarh by M/s Satya Power and Ispat Limited |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 26 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Industry |
| Applicant | Satya Power &ispat Limited |
| Land area | 60 acres (24.3 ha) |
| Project cost | ₹375 crore |
| Village / locality | Gatauri |
| Taluk / tehsil | Bilaspur |
| District | Bilaspur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01951 |
In context
47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 60 acres, this one is smaller than 66% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gatauri, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Surrender of Coal Washery of 14,40,000 TPA Capacity from existing EC granted… — lapsed, 0 m away
- Proposed Expansion of Steel Plant- DRI Kilns(Sponge Iron from 90,000 TPA to… — lapsed, 50 m away
- Proposed Expansion of Steel Plant- DRI Kilns(Sponge Iron from 90,000 TPA to… — cleared for impact study, 50 m away
- Proposed expansion of Steel Plant–DRI Kilns (Sponge Iron from 90000 TPA to… — more information requested, 100 m away
- Coal Washery Project of MANIKARNIKA LOGISTICS PRIVATE LIMITED — under environmental review, 300 m away
- Ankit Kumar Mishra — environmental approval granted, 2.1 km away
- Ankit Kumar Mishra — cleared for impact study, 2.1 km away
- Amit Yadav — environmental approval granted, 2.3 km away
More from Satya Power &ispat Limited in Bilaspur
- Proposed Expansion of Steel Plant- DRI Kilns(Sponge Iron from 90,000 TPA to… — lapsed
- Surrender of Coal Washery of 14,40,000 TPA Capacity from existing EC granted… — lapsed
- Proposed Expansion of Steel Plant- DRI Kilns(Sponge Iron from 90,000 TPA to… — cleared for impact study
- Proposed expansion of Steel Plant–DRI Kilns (Sponge Iron from 90000 TPA to… — more information requested
5 Satya Power &ispat projects in Bilaspur
All 7 Satya Power &ispat projects across India