WithdrawnMining · Bastar, Chhattisgarh

Limestone Mineral Applied lease area: 0.825 ha., Production capacity: 11,250 TPA

Limestone Mineral Applied lease area: 0.825 ha., Production capacity: 11,250 TPA is a withdrawn mining project in Jagdalpur, Bastar, Chhattisgarh. The site covers 2.1 acres. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “Withdrawn” (since 5 Mar 2025).

See it on the live map All projects in Bastar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Limestone Mineral Applied lease area: 0.825 ha., Production capacity: 11,250 TPA is a withdrawn mining project in Jagdalpur, Bastar, Chhattisgarh. The site covers 2.1 acres.

Who is building it?

The applicant is Satyanarain Singhal.

Has it been approved?

No. The application was withdrawn on 5 Mar 2025, so it is no longer under consideration.

Where is it?

In Jagdalpur, Bastar, Chhattisgarh.

How big is it?

It has a stated cost of ₹55 lakh and a site of 2.1 acres.

When was it filed?

The application was filed on 15 Feb 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Limestone Mineral Applied lease area: 0.825 ha., Production capacity: 11,250 TPA

Project details

Official titleLimestone Mineral Applied lease area: 0.825 ha., Production capacity: 11,250 TPA At Village- Kangoli, Tehsil-Jagdalpur, District- Bastar (Chhattisgarh). in favor of Shri Satyanarayan Agarwal
StatusWithdrawn
Status since5 Mar 2025
Application filed15 Feb 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSatyanarain Singhal
Land area2.1 acres (0.8 ha)
Project cost₹55 lakh
Village / localityJagdalpur
Taluk / tehsilJagdalpur
DistrictBastar
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02127

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 28 Feb 2024Environmental approval granted2.1 acres₹55 lakh
New project filed 15 Feb 2024 (this page)Withdrawn2.1 acres₹55 lakh

In context

180 applications in Bastar since January 2022 are in the same category (Mining): 35 approved, 23 filed or under review, and 122 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 2.1 acres, this one is smaller than 87% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 3.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.

Where it is

Jagdalpur, Bastar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.