Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Nov 2025 |
| Application filed | 20 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nutan Chandra |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹39 lakh |
| Village / locality | Nargora |
| Taluk / tehsil | Masturi |
| District | Bilaspur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02287 |
In context
180 applications in Bilaspur since January 2022 are in the same category (Mining): 90 approved, 21 filed or under review, and 69 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1.5 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Nargora, Masturi, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nutan Chandra — lapsed, 0 m away
- Transfer of EC for 3.6 MTPA Wet Type Coal Washery — environmental approval granted, 3.8 km away
- Sipat Super Thermal Power Project Stage-III (1x800 MW) — environmental approval granted, 6.2 km away
- Drilling of 44 Nos. Boreholes of 3 Inch Dia. in 17.65 Sq Km for Proposed… — more information requested, 6.6 km away
- Bilaspur Pumped Storage Project (1000 MW) — lapsed, 6.9 km away
- Bilaspur Pumped Storage Project (1000 MW) — cleared for impact study, 7.6 km away
- Bilaspur Pumped Storage Project (1000 MW) — cleared for impact study, 7.6 km away
- Selar Bricks Earth & Kiln Quarry -1 — lapsed, 9 km away
More from Nutan Chandra in Bilaspur
- Nutan Chandra — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.