Quick answers
What is this project?
Expansion of Ferro Alloys Production Unit (Unit I) At Plot No. 567/B, 568, 553/B, Urla Industrial Area, District- Raipur, Chhattisgarh- 492003 By Hira Ferro Alloys Limited (HFAL) is a proposed industrial project in Achholi, Raipur, Chhattisgarh. The site covers 8.1 acres.
Who is building it?
The applicant is Hira Ferro Alloys Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 10 Aug 2024), as of 27 Nov 2026.
Where is it?
In Achholi, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹13.9 crore and a site of 8.1 acres.
When was it filed?
The application was filed on 21 Apr 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of Ferro Alloys Production Unit (Unit I) At Plot No. 567/B, 568, 553/B, Urla…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Aug 2024 |
| Application filed | 21 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Hira Ferro Alloys Limited |
| Land area | 8.1 acres (3.3 ha) |
| Project cost | ₹13.9 crore |
| Village / locality | Achholi |
| Taluk / tehsil | Raipur |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02313 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 4 Feb 2026 | Returned to applicant | 8.1 acres | ₹27.9 crore |
| Expansion filed 27 Jan 2025 | Environmental approval granted | 8.1 acres | ₹13.9 crore |
| Early planning filed 21 Apr 2024 (this page) | Cleared for impact study | 8.1 acres | ₹13.9 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.1 acres, this one is smaller than 66% of them.
75 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Achholi, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Ferro Alloys Production Unit (Unit I) At Plot No. 567/B, 568,… — returned to applicant, 0 m away
- Expansion of Ferro Alloys Production Unit (Unit I) At Plot No. 567/B, 568,… — environmental approval granted, 0 m away
- Kisan Steel Rolling Mill — cleared for impact study, 50 m away
- Surrender of EC as Standalone Rolling Mills are now exepted — lapsed, 100 m away
- Expansion of Ferro Alloys Production Unit at P.H. No. 0028, Plot No.… — environmental approval granted, 200 m away
- Expansion of Ferro Alloys Production Unit at P.H. No. 0028, Plot No.… — cleared for impact study, 200 m away
- Aditya Steels — under environmental review, 300 m away
- Industrial project by M/s. Sunil Steels (A Unit of Sunil Rerollers & Steel… — initial checks, 400 m away
More from Hira Ferro Alloys Limited in Raipur
- Expansion of Ferro Alloys Production Unit (Unit II) located at Urla Industrial… — returned to applicant
- Expansion of Ferro Alloys Production Unit (Unit II) located at Urla Industrial… — returned to applicant
- Expansion of Ferro Alloys Production Unit (Unit II) located at Urla Industrial… — lapsed
- Expansion of Ferro Alloys Production Unit (Unit II) located at Urla Industrial… — environmental approval granted
- Expansion of Ferro Alloys Production Unit (Unit II) located at Urla Industrial… — cleared for impact study
All 8 Hira Ferro Alloys projects across India