What is this project?
Steel plant comprising of DRI Kilns (Sponge Iron – 1,32,000 TPA), WHRB based Power Plant – 2 x 4.0 MW, FBC based Power Plant –1 x 4.0 MW, Submerged Electric Arc Furnace of 1 X 11 MVA (FeSi-8,500TPA / FeMn-24,400 TPA / SiMn-17,100 TPA / FeCr-18,000 TPA/ Pig Iron-29,300 TPA), Briquetting Plant - 120 kg/hr. & Brick Manufacturing unit –17,000 Bricks / Day in the existing premises of Induction Furnace unit (operating based on consent, proposed to be dismantled) is a proposed industrial project in Natwarpur, Raigarh, Chhattisgarh. The site covers 107.5 acres.
Who is building it?
The applicant is Maa Mani Industries (P) LTD.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 May 2025), as of 27 Nov 2026.
Where is it?
In Natwarpur, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹240 crore and a site of 107.5 acres.
When was it filed?
The application was filed on 9 Apr 2025.
Project details
| Official title | Establishment of steel plant comprising of DRI Kilns (Sponge Iron – 1,32,000 TPA), WHRB based Power Plant – 2 x 4.0 MW, FBC based Power Plant –1 x 4.0 MW, Submerged Electric Arc Furnace of 1 X 11 MVA (FeSi-8,500TPA / FeMn-24,400 TPA / SiMn-17,100 TPA / FeCr-18,000 TPA/ Pig Iron-29,300 TPA), Briquetting Plant - 120 kg/hr. & Brick Manufacturing unit –17,000 Bricks / Day in the existing premises of Induction Furnace unit (operating based on consent, proposed to be dismantled). |
|---|---|
| Status | Cleared for impact study |
| Status since | 18 May 2025 |
| Application filed | 9 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Maa Mani Industries (P) LTD |
| Land area | 107.5 acres (43.5 ha) |
| Project cost | ₹240 crore |
| Village / locality | Natwarpur |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02668 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 107.5 acres, this one is larger than 58% of them.
Where it is
Natwarpur, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hemant Jatwar — environmental approval granted, 8.1 km away
- Ramanand Jatwar — environmental approval granted, 9 km away
- Rakesh Ratre — environmental approval granted, 9.1 km away
- Diversion of Forest Land of 3.895 Hec at Rera/Mudiadih/Jirdi Teh - Sarangarh,… — lapsed, 9.5 km away
- Balaji Minerals — lapsed, 12 km away
- Shri Agrawal Crusher Udyog — lapsed, 12 km away
- Mining project by M/S Shri Balaji Crusher Udyog Prop Smt. Renu Agrawal (Area… — lapsed, 12 km away
- Kharribade Limestone Quarry — lapsed, 12 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.