Cleared for impact studyPower · Raigarh, Chhattisgarh

Expansion of existing Power Plant Phase I 1x600MW, Operational and Phase II 2x800MW Ultra Super Critical under construction by adding Phase III 2x800MW, Ultra Super Critical TPP at Villages Chhote & Bade Bhandar, Barpali, Kotma and Sarwani, Tehsil Pussore, District Raigarh, Chhattisgarh by Adani Power Limited, Raigarh

Expansion of existing Power Plant Phase I 1x600MW, Operational and Phase II 2x800MW Ultra Super Critical under construction by adding Phase III 2x800MW, Ultra Super Critical TPP at Villages Chhote & Bade Bhandar, Barpali, Kotma and Sarwani, Tehsil Pussore, District Raigarh, Chhattisgarh by Adani Power Limited, Raigarh is a proposed power project in Kotmara, Pusour, Raigarh, Chhattisgarh. The site covers 457.8 acres. Its stated project cost is ₹32,292 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Dec 2025).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of existing Power Plant Phase I 1x600MW, Operational and Phase II 2x800MW Ultra Super Critical under construction by adding Phase III 2x800MW, Ultra Super Critical TPP at Villages Chhote & Bade Bhandar, Barpali, Kotma and Sarwani, Tehsil Pussore, District Raigarh, Chhattisgarh by Adani Power Limited, Raigarh is a proposed power project in Kotmara, Pusour, Raigarh, Chhattisgarh. The site covers 457.8 acres.

Who is building it?

The applicant is Adani Power Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 6 Dec 2025), as of 27 Nov 2026.

Where is it?

In Kotmara, Pusour, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹32,292 crore and a site of 457.8 acres.

When was it filed?

The application was filed on 4 Nov 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of existing Power Plant Phase I 1x600MW, Operational and Phase II 2x800MW…

Project details

StatusCleared for impact study
Status since6 Dec 2025
Application filed4 Nov 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorPower
ApplicantAdani Power Limited
Land area457.8 acres (185.3 ha)
Project cost₹32,292 crore
Village / localityKotmara
Taluk / tehsilPusour
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02835

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 31 Aug 2026Environmental approval granted₹32,292 crore
Early planning filed 4 Nov 2025 (this page)Cleared for impact study457.8 acres₹32,292 crore

In context

29 applications in Raigarh since January 2022 are in the same category (Power): 13 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 457.8 acres, this one is smaller than 61% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kotmara, Pusour, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Adani Power Limited in Raigarh

7 Adani Power projects in Raigarh
All 68 Adani Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.