Quick answers
What is this project?
Proposed project to produce Ferro Alloys (SAF 18 MVA X 4 Nos); FBC based CPP 60 MW by Sambhv Steel Tubes Limited (Unit-3) is a proposed industrial project in Sarora, Tilda, Raipur, Chhattisgarh. The site covers 22.7 acres.
Who is building it?
The applicant is Sambhv Steel Tubes Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 2 Dec 2025), as of 27 Nov 2026.
Where is it?
In Sarora, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹360.3 crore and a site of 22.7 acres.
When was it filed?
The application was filed on 1 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed project to produce Ferro Alloys (SAF 18 MVA X 4 Nos); FBC based CPP 60 MW by…
Project details
| Official title | Proposed project to produce Ferro Alloys (SAF 18 MVA X 4 Nos); FBC based CPP 60 MW by Sambhv Steel Tubes Limited (Unit-3) at Village - Sarora, Tehsil - Tilda, District - Raipur (C.G.) 493 221. |
|---|---|
| Status | Cleared for impact study |
| Status since | 2 Dec 2025 |
| Application filed | 1 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sambhv Steel Tubes Limited |
| Land area | 22.7 acres (9.2 ha) |
| Project cost | ₹360.3 crore |
| Village / locality | Sarora |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02876 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Jul 2026 | Environmental approval granted | 22.7 acres | ₹360.3 crore |
| Early planning filed 1 Dec 2025 (this page) | Cleared for impact study | 22.7 acres | ₹360.3 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 22.7 acres, this one is smaller than 52% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarora, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project to produce Ferro Alloys (SAF 18 MVA X 4 Nos); FBC based CPP… — environmental approval granted, 0 m away
- Proposed project to produce Sponge Iron 165000 TPA, MS Billets 262500 TPA,… — withdrawn, 0 m away
- Change in the Name of Company, No Change in Ownership , No Transfer of Ec… — environmental approval granted, 350 m away
- No Increase in Pollution Load and No Increase in Production Capacity of the… — initial checks, 350 m away
- Central Cement Industries — withdrawn, 600 m away
- Industrial project by M/S Central Cement Industries — initial checks, 750 m away
- Industrial project by M/S Central Cement Industries — environmental approval granted, 750 m away
- Industrial project by M/S Central Cement Industries — cleared for impact study, 750 m away
More from Sambhv Steel Tubes Limited in Raipur
- Proposed project to produce Sponge Iron 165000 TPA, MS Billets 262500 TPA,… — withdrawn
- Change in the Name of Company, No Change in Ownership , No Transfer of Ec… — environmental approval granted
4 Sambhv Steel Tubes projects in Raipur
All 5 Sambhv Steel Tubes projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.