Environmental approval grantedMining · Baloda Bazar, Chhattisgarh

Expansion in Limestone Production Capacity from 2.0 Million TPA to 6.3 Million TPA (ROM 6.5 Million TPA including 0.2 Million TPA screen rejects), Sub-grade 1.7 Million TPA, Top Soil 0.27 Million TPA, Waste 2.55 Million TPA (Total Excavation 11.02 Million TPA)

Expansion in Limestone Production Capacity from 2.0 Million TPA to 6.3 Million TPA (ROM 6.5 Million TPA including 0.2 Million TPA screen rejects), Sub-grade 1.7 Million TPA, Top Soil 0.27 Million TPA, Waste 2.55 Million TPA (Total Excavation 11.02 Million TPA) is an approved mining project in Devrani, Bhatapara, Baloda Bazar, Chhattisgarh. The site covers 1,368.1 acres. Its stated project cost is ₹291 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 3 Oct 2025).

See it on the live map All projects in Baloda Bazar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleExpansion in Limestone Production Capacity from 2.0 Million TPA to 6.3 Million TPA (ROM 6.5 Million TPA including 0.2 Million TPA screen rejects), Sub-grade 1.7 Million TPA, Top Soil 0.27 Million TPA, Waste 2.55 Million TPA (Total Excavation 11.02 Million TPA) along with existing crusher of 1800 TPH with screen and a proposed crusher of 1800 TPH capacity in Maldi Mopar Limestone Mine (ML Area – 553.656 ha) in revenue Villages of Tehsil: Baloda Bazar, District- Baloda Bazar-Bhatapara, CG
StatusEnvironmental approval granted
Status since3 Oct 2025
Application filed16 Jul 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorMining
ApplicantAmbuja Cements Limited
Land area1,368.1 acres (553.7 ha)
Project cost₹291 crore
Village / localityDevrani
Taluk / tehsilBhatapara
DistrictBaloda Bazar
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02908

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 17 Mar 2026Returned to applicant1,368.1 acres₹291 crore
Expansion filed 16 Jul 2025 (this page)Environmental approval granted1,368.1 acres₹291 crore

In context

181 applications in Baloda Bazar since January 2022 are in the same category (Mining): 84 approved, 29 filed or under review, and 68 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 1,368.1 acres, this one is larger than 98% of them.

No other mining lease on record is within 500 m of this site; 15 have applied within 5 km.

Where it is

Devrani, Bhatapara, Baloda Bazar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ambuja Cements Limited in Baloda Bazar

5 Ambuja Cements projects in Baloda Bazar
All 87 Ambuja Cements projects across India

About this information