One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion From 1.6 Mtpa to 2.1 Mtpa Clinker
Project details
| Official title | Proposed Expansion From 1.6 Mtpa to 2.1 Mtpa Clinker Along With Enhancement of Cement Production From 2.24 Mtpa to 3.1 Mtpa Within the Existing Premises Involving Change in Product Mix With Introduction of Pcc Within the Same Area of 82 Ha. by Nuvoco Vistas Corporation PVT. LTD. in Arasmeta Cement Plant Located at P.O.-Gopal Nagar, District. - Janjgir Champa, Chhattisgarh to Be Carried Out in Two Phases With 20% Enhancement in Production Capacity in Each Phase. |
|---|---|
| Status | Withdrawn |
| Status since | 23 May 2026 |
| Application filed | 23 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | NUVOCO VISTAS CORPORAtion limited |
| Land area | 202.6 acres (82 ha) |
| Project cost | ₹2,456.3 crore |
| Village / locality | Arasmeta |
| Taluk / tehsil | Akaltara |
| District | Janjgir - Champa |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03213 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 13 Jul 2026 | Returned to applicant | 202.6 acres | ₹2,456.3 crore |
| Early planning filed 23 May 2026 (this page) | Withdrawn | 202.6 acres | ₹2,456.3 crore |
In context
13 applications in Janjgir - Champa since January 2022 are in the same category (Industry): 10 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 202.6 acres, this one is larger than 54% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Arasmeta, Akaltara, Janjgir - Champa, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion From 1.6 Mtpa to 2.1 Mtpa Clinker — returned to applicant, 0 m away
- Change in Name in Environment Clearance of "Expansion of Arasmeta Limestone… — under environmental review, 1.3 km away
- Expansion of Coal Based Thermal Power Plant (Phase-II) from 3x600 MW to 6x600… — environmental approval granted, 5.8 km away
- Expansion of Coal Based Thermal Power Plant (Phase-II) from 3x600 MW to 6x600… — environmental approval granted, 5.8 km away
- Expansion of Coal Based Thermal Power Plant (Phase-II) from 3x600 MW to 6x600… — returned to applicant, 5.8 km away
- Expansion of Coal Based Thermal Power Plant (Phase-II) from 3x600 MW to 6x600… — environmental approval granted, 5.8 km away
- Expansion of Coal Based Thermal Power Plant (Phase-II) from 3x600 MW to 6x600… — lapsed, 5.8 km away
- Expansion of Coal Based Thermal Power Plant (Phase-II) from 3x600 MW to 6x600… — returned to applicant, 5.8 km away
More from NUVOCO VISTAS CORPORAtion limited in Janjgir - Champa
- Change in Name in Environment Clearance of "Expansion of Arasmeta Limestone… — under environmental review
- Change in Name from "Kirari Limestone Mines of M/s. Lafarge India Limited… — environmental approval granted
4 Nuvoco Vistas Corporation projects in Janjgir - Champa
All 24 Nuvoco Vistas Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.