Quick answers
What is this project?
Proposed Residential villas project :- SRSB Infrastructure PVT. LTD is a lapsed building project in Jhanjh, Arang, Raipur, Chhattisgarh. The site covers 18.6 acres.
Who is building it?
The applicant is Srsb Infrastructure Private Limited.
Has it been approved?
No. The application was lapsed on 29 Aug 2026, so it is no longer under consideration.
Where is it?
In Jhanjh, Arang, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹132 crore and a site of 18.6 acres.
When was it filed?
The application was filed on 15 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Aug 2026 |
| Application filed | 15 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Srsb Infrastructure Private Limited |
| Land area | 18.6 acres (7.5 ha) |
| Project cost | ₹132 crore |
| Village / locality | Jhanjh |
| Taluk / tehsil | Arang |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03440 |
In context
56 applications in Raipur since January 2022 are in the same category (Buildings & townships): 29 approved, 18 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 18.6 acres, this one is larger than 54% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jhanjh, Arang, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Commercial Plotting Layout project "Erawat Developers Private… — under environmental review, 450 m away
- Chhattisgarh State Power Companies Head Office — environmental approval granted, 1.1 km away
- Residential (Plotted & Flatted) project "EVARAA" by DEE VEE PROJECTS LIMITED — environmental approval granted, 1.8 km away
- Residential (Plotted & Flatted) project "EVARAA" by DEE VEE PROJECTS LIMITED — cleared for impact study, 1.8 km away
- Proposed Commercial Plotting Layout project "CIVIC CENTER" at Sector-21… — environmental approval granted, 2.1 km away
- Chitrotpala International Film City and Tribal & Cultural Convention Centre — under environmental review, 2.7 km away
- Residential and day school in Sector-7, Nava Raipur, Chhattisgarh by M/s… — under environmental review, 3.7 km away
- Residential and day school in Sector-7, Nava Raipur, Chhattisgarh by M/s… — environmental approval granted, 3.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.