What is Developing? Open the mapMap

Environmental approval grantedIndustry · Janjgir - Champa, Chhattisgarh

Proposed expansion by Establishment of Pellet Plant 0.4MTPA,1x350TPD DRIKilns(spongeiron- 1,15,500 TPA), 1 x 15 MVA Ferro Alloys Unit (FeMn-40,300 TPA / SiMn-28,215 TPA / Pig Iron – 56,400 TPA.), Fly ash Brick making plant of 8.6 million Bricks per Annum (26,000 bricks/day)by forward integration in the existing 15 MW Biomass based power plant premises & Conversion of existing 15MW Biomassbasedpowerplant to8.0MW WHRB&7.0MW Dolochar&Coalbasedpower plant.MVK Industries Pvt. Ltd.

Proposed expansion by Establishment of Pellet Plant 0.4MTPA,1x350TPD DRIKilns(spongeiron- 1,15,500 TPA), 1 x 15 MVA Ferro Alloys Unit (FeMn-40,300 TPA / SiMn-28,215 TPA / Pig Iron – 56,400 TPA.), Fly ash Brick making plant of 8.6 million Bricks per Annum (26,000 bricks/day)by forward integration in the existing 15 MW Biomass based power plant premises & Conversion of existing 15MW Biomassbasedpowerplant to8.0MW WHRB&7.0MW Dolochar&Coalbasedpower plant.MVK Industries Pvt. Ltd is an approved industrial project in Kirari, Akaltara, Janjgir - Champa, Chhattisgarh. The site covers 32.2 acres. Its stated project cost is ₹233 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 25 Nov 2026).

See it on the live map All projects in Janjgir - Champa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since25 Nov 2026
Application filed29 Jul 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantMvk Industries Private Limited
Land area32.2 acres (13.1 ha)
Project cost₹233 crore
Village / localityKirari
Taluk / tehsilAkaltara
DistrictJanjgir - Champa
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03523

In context

13 applications in Janjgir - Champa since January 2022 are in the same category (Industry): 10 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 32.2 acres, this one is smaller than 85% of them.

133 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kirari, Akaltara, Janjgir - Champa, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.