What is Developing? Open the mapMap

LapsedIndustry · Bametara, Chhattisgarh

Environmental Clearance for establishment of Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 4,15,800 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strips) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 2,64,000 TPA), Gasifier for Reheating Furnace – (1 x 5000 NM3/Hr), Ferro Alloy Unit 3 x 9 MVA (FeSi – 21,000 TPA / FeMn – 60,000 TP

Environmental Clearance for establishment of Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 4,15,800 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strips) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 2,64,000 TPA), Gasifier for Reheating Furnace – (1 x 5000 NM3/Hr), Ferro Alloy Unit 3 x 9 MVA (FeSi – 21,000 TPA / FeMn – 60,000 TP is a lapsed industrial project in Koharia, Berla, Bametara, Chhattisgarh. The site covers 59.9 acres. Its stated project cost is ₹768 crore. As of 27 Nov 2026, its status is “Lapsed” (since 5 Nov 2026).

See it on the live map All projects in Bametara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for establishment of Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 4,15,800 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strips) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 2,64,000 TPA), Gasifier for Reheating Furnace – (1 x 5000 NM3/Hr), Ferro Alloy Unit 3 x 9 MVA (FeSi – 21,000 TPA / FeMn – 60,000 TP is a lapsed industrial project in Koharia, Berla, Bametara, Chhattisgarh. The site covers 59.9 acres.

Who is building it?

The applicant is Vrajesh Steels Private Limited.

Has it been approved?

No. The application was lapsed on 5 Nov 2026, so it is no longer under consideration.

Where is it?

In Koharia, Berla, Bametara, Chhattisgarh.

How big is it?

It has a stated cost of ₹768 crore and a site of 59.9 acres.

When was it filed?

The application was filed on 23 Apr 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for establishment of Greenfield steel plant comprising of DRI…

Project details

StatusLapsed
Status since5 Nov 2026
Application filed23 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantVrajesh Steels Private Limited
Land area59.9 acres (24.3 ha)
Project cost₹768 crore
Village / localityKoharia
Taluk / tehsilBerla
DistrictBametara
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03688

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 Apr 2026 (this page)Lapsed59.9 acres₹768 crore
Early planning filed 6 Dec 2024Cleared for impact study59.9 acres₹768 crore

In context

24 applications in Bametara since January 2022 are in the same category (Industry): 15 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 59.9 acres, this one is larger than 63% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Koharia, Berla, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vrajesh Steels Private Limited in Bametara

All 3 Vrajesh Steels projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.