Quick answers
What is this project?
Environmental Clearance for establishment of Greenfield steel plant comprising of DRI Kilns (Sponge Iron – 4,29,000 TPA), Induction Furnace with LRF & CCM (Hot Billets / MS Billets / Ingots – 4,15,800 TPA), Rolling mills (TMT bars / Structural Steel / Wire rod / Strips) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gasifier as fuel)– 2,64,000 TPA), Gasifier for Reheating Furnace – (1 x 5000 NM3/Hr), Ferro Alloy Unit 3 x 9 MVA (FeSi – 21,000 TPA / FeMn – 60,000 TP is a lapsed industrial project in Koharia, Berla, Bametara, Chhattisgarh. The site covers 59.9 acres.
Who is building it?
The applicant is Vrajesh Steels Private Limited.
Has it been approved?
No. The application was lapsed on 5 Nov 2026, so it is no longer under consideration.
Where is it?
In Koharia, Berla, Bametara, Chhattisgarh.
How big is it?
It has a stated cost of ₹768 crore and a site of 59.9 acres.
When was it filed?
The application was filed on 23 Apr 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for establishment of Greenfield steel plant comprising of DRI…
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 23 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Vrajesh Steels Private Limited |
| Land area | 59.9 acres (24.3 ha) |
| Project cost | ₹768 crore |
| Village / locality | Koharia |
| Taluk / tehsil | Berla |
| District | Bametara |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03688 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Apr 2026 (this page) | Lapsed | 59.9 acres | ₹768 crore |
| Early planning filed 6 Dec 2024 | Cleared for impact study | 59.9 acres | ₹768 crore |
In context
24 applications in Bametara since January 2022 are in the same category (Industry): 15 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 59.9 acres, this one is larger than 63% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Koharia, Berla, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for establishment of Greenfield steel plant comprising… — cleared for impact study, 0 m away
- Greenfield steel plant comprising of Sinter Plants (1 x 60 m2 ) to produce… — lapsed, 0 m away
- Berlakala Bricks Earth Clay Quarry (Rekha Yadu) — lapsed, 5.3 km away
- Berlakala Clay Mine — lapsed, 5.3 km away
- M/s Berlakala Bricks Earth Quarry — not approved, 5.3 km away
- M/s Berlakala Bricks Earth Quarry — cleared for impact study, 5.3 km away
- Berlakala Bricks Earth Clay Quarry — lapsed, 5.3 km away
- Berlakala Bricks Earth Clay Quarry — lapsed, 5.3 km away
More from Vrajesh Steels Private Limited in Bametara
All 3 Vrajesh Steels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.