Quick answers
What is Construction of Road from Mudhi To Malsema under PM-JANMAN?
Construction of Road from Mudhi To Malsema under PM-JANMAN is a lapsed road project in Murhi, Bagicha, Jashpur, Chhattisgarh. The site covers 11.2 acres.
Who is building it?
The applicant is Chhattisgarh Rural Road Development Agency CGRRDA, Jashpur.
Has it been approved?
No. The application was lapsed on 23 Oct 2024, so it is no longer under consideration.
Where is it?
In Murhi, Bagicha, Jashpur, Chhattisgarh.
How big is it?
It has a stated cost of ₹6 crore; a site of 11.2 acres and 6 acres (2.4 ha) of forest land.
When was it filed?
The application was filed on 6 Aug 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Oct 2024 |
| Application filed | 6 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Chhattisgarh Rural Road Development Agency CGRRDA, Jashpur |
| Land area | 11.2 acres (4.5 ha) |
| Forest land | 6 acres (2.4 ha) |
| Project cost | ₹6 crore |
| Village / locality | Murhi |
| Taluk / tehsil | Bagicha |
| District | Jashpur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03930 |
In context
13 applications in Jashpur since January 2022 are in the same category (Roads & highways): 2 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. At 11.2 acres, this one is larger than 67% of them.
Where it is
Murhi, Bagicha, Jashpur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dangari Pumped Storage Hydro-electric Project (1400 MW) — cleared for impact study, 8.4 km away
- Dangari Pumped Storage Hydro-electric Project (1400 MW) — returned to applicant, 8.4 km away
- Construction of Road from Dangari Road To Bewra under PM-JANMAN — lapsed, 8.8 km away
- Rouni 2100 MW Pumped Storage Project — forest land use approved, 9.2 km away
- Rouni 2100 MW Pumped Storage Project — lapsed, 9.4 km away
- Drilling of 10 Nos Boreholes for Proposed Dangari 1400 MW Pumped Storage Hydro… — forest land use approved, 10 km away
- Drilling of 10 Nos Boreholes for Proposed Dangari 1400 MW Pumped Storage Hydro… — lapsed, 10 km away
- Rouni Pumped Storage Hydro-electric Project (2100 MW) — cleared for impact study, 10 km away
More from Chhattisgarh Rural Road Development Agency CGRRDA, Jashpur in Jashpur
- Pre-Existing Village Road Into Bituminous Road (Lotadand-Rengle… — initial checks
- Pre-Existing Village Road Into Bituminous Road (Lotadand-Rengle… — under wildlife review
- Construction of Road from Lotadand Rengle to Machharipani — withdrawn
- Construction of Road from Lotadand Rengle to Machharipani — decision issued
- Construction of Road From Shahidand to Kanwatongari PMGSY Road — more information requested
- Construction of Road From Shahidand to Kanwadongari — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.