Quick answers
What is this project?
Banai & Bhalumuda Opencast Coal Mine project of M/s Jindal Power Limited located at Villages Auraimuda, Banai, Barkaspali, Bhalumuda, Chirramuda, Charbhantha, Chitwahi, Dholnara, Dolesara, Kasaiya, Kerakhol, Kognara, Kolam, Muskura, Noondarha & Rodopali, Tehsil Tamnar & Gharghoda, District Raigarh, State Chhattisgarh is a proposed mining project in Aura\Mura, Gharghoda, Raigarh, Chhattisgarh. The site covers 8,230.2 acres.
Who is building it?
The applicant is Jindal Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Aura\Mura, Gharghoda, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹3,000 crore; a site of 8,230.2 acres and 520.3 acres (210.6 ha) of forest land.
When was it filed?
The application was filed on 23 Sept 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Banai & Bhalumuda Opencast Coal Mine project of M/s Jindal Power Limited located at…
Project details
| Status | More information requested |
|---|---|
| Status since | 5 Oct 2026 |
| Application filed | 23 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Jindal Power Limited |
| Land area | 8,230.2 acres (3,330.6 ha) |
| Forest land | 520.3 acres (210.6 ha) |
| Project cost | ₹3,000 crore |
| Village / locality | Aura\Mura |
| Taluk / tehsil | Gharghoda |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03988 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Oct 2026 | Under forest review | 0.8 acres | ₹3,000 crore |
| New project filed 23 Sept 2026 (this page) | More information requested | 8,230.2 acres | ₹3,000 crore |
In context
230 applications in Raigarh since January 2022 are in the same category (Mining): 83 approved, 47 filed or under review, and 100 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 8,230.2 acres, this one is larger than 99% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 16,460.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Aura\Mura, Gharghoda, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to South Eastern Coalfields Plans a 15-Million-Tonne-a-Year Coal Mine Expansion in Raigarh, Chhattisgarh (11.7 km away).
Other projects nearby
- Banai & Bhalumunda Opencast Coal Mine project of M/s Jindal Power Limited… — under environmental review, 150 m away
- Banai & Bhalumuda Opencast Coal Mine project of M/s Jindal Power Limited… — under forest review, 450 m away
- KHARSIA-DHARAMJAIGARH- SPUR 2ND BLOCK SECTION (BHALUMUDA-GARE PELMA) OF EAST… — lapsed, 4 km away
- PROPOSED 4x660 (2640) MW COAL BASED SUPER CRITICAL THERMAL POWER PLANT — withdrawn, 5.2 km away
- Proposed 3x 800 MW (2400 MW) Coal based Ultra-Supercritical Thermal Power… — under environmental review, 6 km away
- Kharsia-Dharamjaigarh- Spur 2nd Block Section (Bhalumuda-Gare Pelma) of East… — lapsed, 6.9 km away
- Expansion of Coal Washery Plant from 0.96 MTPA to 5.2 MTPA in two phases… — environmental approval granted, 7 km away
- Expansion of Coal Washery Plant from 0.96 MTPA to 5.2 MTPA in two phases… — cleared for impact study, 7 km away
More from Jindal Power Limited in Raigarh
- Banai & Bhalumunda Opencast Coal Mine project of M/s Jindal Power Limited… — under environmental review
- Proposed 3x 800 MW (2400 MW) Coal based Ultra-Supercritical Thermal Power… — under environmental review
- Gare Palma Sector-I Coal Mine in Mand Raigarh Coalfield (Block Area: 3020.00… — under environmental review
- Change in Land Use Pattern of 48.208 Ha Already Diverted Forest Land for… — under forest review
- Change in Land Use Pattern of 48.208 Ha Already Diverted Forest Land for… — not approved
- Proposed 3x 800 MW (2400 MW) Coal based Ultra-Supercritical Thermal Power… — returned to applicant
23 Jindal Power projects in Raigarh
All 27 Jindal Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.