What is Developing? Open the mapMap

Forest land use approvedRoads & highways · Narayanpur, Chhattisgarh

Up-Gradation of Nh-130d to Two/Four Lane With Paved Shoulder Configuration From Kondagaon Design Ch. 0.000 Via Narayanpur (Design Ch. 48.693) to Kasturmeta Design Ch. 70.453 Under Epc Mode in the State of Chhattisgarh)

Up-Gradation of Nh-130d to Two/Four Lane With Paved Shoulder Configuration From Kondagaon Design Ch. 0.000 Via Narayanpur (Design Ch. 48.693) to Kasturmeta Design Ch. 70.453 Under Epc Mode in the State of Chhattisgarh) is an approved road project in Bakulwahi, Narayanpur, Chhattisgarh. The site covers 331.5 acres. Its stated project cost is ₹523.1 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 15 Apr 2025).

See it on the live map All projects in Narayanpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusForest land use approved
Status since15 Apr 2025
Application filed29 Dec 2023
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantPublic Works Department National Highway Zone Chhattisgarh
Land area331.5 acres (134.2 ha)
Forest land55.7 acres (22.5 ha)
Project cost₹523.1 crore
Village / localityBakulwahi
Taluk / tehsilNarayanpur
DistrictNarayanpur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-04016

In context

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bakulwahi, Narayanpur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.