Quick answers
What is this project?
JIO DIGITAL FIBRE PRIVATE LIMITED, Gomarda Wild Life Sanctuary (Sarangarh-Bilaigarh Forest Division) Laying down of OFC is a withdrawn road project in Dansara, Sarangarh, Raigarh, Chhattisgarh. The site covers 3.2 acres.
Who is building it?
The applicant is Jio Digital Fibre Private Limited.
Has it been approved?
No. The application was withdrawn on 22 Aug 2025, so it is no longer under consideration.
Where is it?
In Dansara, Sarangarh, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹75 lakh and a site of 3.2 acres.
When was it filed?
The application was filed on 22 Aug 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: JIO DIGITAL FIBRE PRIVATE LIMITED, Gomarda Wild Life Sanctuary (Sarangarh-Bilaigarh…
Project details
| Official title | JIO DIGITAL FIBRE PRIVATE LIMITED, Gomarda Wild Life Sanctuary (Sarangarh-Bilaigarh Forest Division) Laying down of OFC along with RoW (Road Corridor) under Network strengthening in Sarangarh-Bilaigarh District of Chhattisgarh |
|---|---|
| Status | Withdrawn |
| Status since | 22 Aug 2025 |
| Application filed | 22 Aug 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Jio Digital Fibre Private Limited |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Dansara |
| Taluk / tehsil | Sarangarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-04248 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jan 2026 | Under forest review | 3.2 acres | ₹75 lakh |
| New project filed 22 Aug 2025 (this page) | Withdrawn | 3.2 acres | ₹75 lakh |
In context
9 applications in Raigarh since January 2022 are in the same category (Roads & highways): 0 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dansara, Sarangarh, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- JIO DIGITAL FIBRE PRIVATE LIMITED, SARANGARH FOREST DIVISION-Laying down of… — application filed, 0 m away
- JIO DIGITAL FIBRE PRIVATE LIMITED, Gomarda Wild Life Sanctuary (Raigarh Forest… — withdrawn, 0 m away
- JIO DIGITAL FIBRE PRIVATE LIMITED, Gomarda Wild Life Sanctuary… — under forest review, 0 m away
- Shri Agrasen Crusher Udyog — lapsed, 10.1 km away
- Balaji Minerals — lapsed, 10.2 km away
- Mining project by M/S Shri Balaji Crusher Udyog Prop Smt. Renu Agrawal (Area… — lapsed, 10.3 km away
- Kharribade Limestone Quarry — lapsed, 10.3 km away
- Kharribade Limestone Quarry — not approved, 10.3 km away
More from Jio Digital Fibre Private Limited in Raigarh
- JIO DIGITAL FIBRE PRIVATE LIMITED, SARANGARH FOREST DIVISION-Laying down of… — application filed
- JIO DIGITAL FIBRE PRIVATE LIMITED, RAIGARH FOREST DIVISION-Laying down of OFC — lapsed
- JIO DIGITAL FIBRE PRIVATE LIMITED, Gomarda Wild Life Sanctuary (Raigarh Forest… — withdrawn
5 Jio Digital Fibre projects in Raigarh
All 787 Jio Digital Fibre projects across India