WithdrawnBuildings & townships · Chandigarh, Chandigarh

Berkeley Square by M/s RSA Motors Pvt. Ltd.

Berkeley Square by M/s RSA Motors Pvt. Ltd is a withdrawn building project in Chandigarh. The site covers 1.1 acres. Its stated project cost is ₹19.5 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 12 Jun 2026).

See it on the live map All projects in Chandigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Berkeley Square by M/s RSA motors pvt. ltd.

Project details

StatusWithdrawn
Status since12 Jun 2026
Application filed12 Jun 2026
Approval soughtEnvironmental approval
Application typeAmendment
SectorBuildings & townships
ApplicantRsa Motors Private Limited
Land area1.1 acres (0.5 ha)
Project cost₹19.5 crore
Village / localityChandigarh
Taluk / tehsilChandigarh
DistrictChandigarh
StateChandigarh
Location fromSite boundary on record
Our referenceWID-CH-00017

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 12 Jun 2026 (this page)Withdrawn1.1 acres₹19.5 crore
Amendment filed 12 Feb 2026Environmental approval granted1.1 acres₹19.5 crore

What the filings say

What is planned

Berkeley Square is a commercial complex located at Plot No 24, Industrial Area Phase I, Chandigarh. According to the applicant's project report, the development is already constructed and has been granted a previous Environmental Clearance in 2015. The current application is for an amendment due to changes in the pollution load of the complex.

The project comprises several commercial components, including offices, a restaurant, a food court, and a healthcare facility featuring a hospital, nursing homes, and an IVF center. The total built-up area is approximately 22,019.82 sq. m. on a plot of 4,470.95 sq. m. (1.10 acres). The complex is designed to accommodate a total population of 1,897 persons, including 1,797 regular occupants and visitors, and 100 staff members.

ItemDetail
Total Plot Area4,470.95 sq. m. (1.10 acres)
Total Built-up Area22,019.82 sq. m.
Permissible FAR200% (8,941.90 sq. m.)
Total Population1,897 persons
Total Water Requirement104 KLD
STP Capacity100 KLD
Total Power Requirement1,808 kW
Total Parking Provided358 ECS

Layout and design

The building configuration includes a ground floor and six upper floors. Notably, the third floor is dedicated to parking. The total parking provision of 358 Equivalent Car Spaces (ECS) is distributed across three basements, a lower ground floor, the third floor, and surface parking areas. The ground floor covers 1,977.95 sq. m., while the first to sixth floors (excluding the third-floor parking) cover 6,822.98 sq. m.

Land and surroundings

The project site is situated in the Industrial Area Phase I of Chandigarh. It is accessible via National Highway 05 (NH-05), located 1.8 km to the southwest. The Chandigarh Railway Station is 1.5 km away in the southeast direction, and the Chandigarh Airport is approximately 4.3 km to the south-southeast. The site coordinates are 30°42'40"N latitude and 76°48'30"E longitude.

Water, power and access

The total water requirement is estimated at 104 KLD. This includes 47 KLD for domestic purposes, 19 KLD for cooling, and 38 KLD for flushing. Fresh water (47 KLD) will be sourced from the municipal supply and bore wells.

Power for the complex is supplied by the Chandigarh Electricity Department, with a total requirement of 1,808 kW. For emergency backup, the project uses diesel generator (DG) sets with a total capacity of 1,520 KVA (comprising two 600 KVA units and one 320 KVA unit), equipped with acoustic enclosures and adequate stack heights.

Environmental safeguards

Wastewater generation is projected at 68 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 100 KLD using Moving Bed Bio-Reactor (MBBR) technology. Approximately 57 KLD of treated water will be recycled for flushing and cooling, with only excess treated water discharged into the public sewer. The applicant states that the final outlet water will undergo a bioassay test to ensure a 90% fish survival rate.

Solid waste generation is estimated at 380 kg/day, of which 190 kg is biodegradable waste to be sent to an approved disposal site. Recyclable waste (114 kg/day) will be sold to authorized recyclers. The hospital component will generate approximately 2,727 kg of biomedical waste annually, which will be collected by a Common Bio-Medical Waste Treatment Facility (CBWTF).

For rainwater harvesting, the project includes one recharging pit with a storage and recharge capacity of 3,442.63 cubic meters per annum. Energy conservation measures include the use of LED lighting, which is expected to save 41.1 kW, and five solar street lights providing an additional 2.2 kW of conservation.

RSA Motors Berkeley Square site plan and layout

4 drawings from the project's filings. Sign in free to see them.

RSA Motors Berkeley Square: Site plan: building footprint, parking areas, and internal roads (preview)🔒 Sign in free to see it
Site plan: building footprint, parking areas, and internal roads
RSA Motors Berkeley Square: Location map: Berkeley Square in Industrial Area Phase I (preview)🔒 Sign in free to see it
Location map: Berkeley Square in Industrial Area Phase I
RSA Motors Berkeley Square: Environmental sensitivity map showing nearby water bodies and forests (preview)🔒 Sign in free to see it
Environmental sensitivity map showing nearby water bodies and forests
RSA Motors Berkeley Square: Water balance diagram: fresh water, recycling, and treatment flow (preview)🔒 Sign in free to see it
Water balance diagram: fresh water, recycling, and treatment flow

In context

21 applications in Chandigarh since January 2022 are in the same category (Buildings & townships): 9 approved, 1 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 100% of them.

18 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chandigarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Rsa Motors Private Limited in Chandigarh

All 3 Rsa Motors projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.