Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Nov 2026 |
| Application filed | 24 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Estate Office |
| Use | Commercial |
| Units | 244 |
| Land area | 82 acres (33.2 ha) |
| Built-up area | 3,20,238 m² (34,47,010 sq ft) |
| Plot area | 3,31,821 m² (35,71,688 sq ft) |
| Project cost | ₹22.3 crore |
| Village / locality | Chandigarh |
| Taluk / tehsil | Chandigarh |
| District | Chandigarh |
| State | Chandigarh |
| Location from | Site boundary on record |
| Our reference | WID-CH-00023 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Apr 2026 (this page) | Environmental approval granted | 82 acres | ₹22.3 crore |
| Early planning filed 1 Apr 2026 | Cleared for impact study | 82 acres | ₹22.3 crore |
In context
21 applications in Chandigarh since January 2022 are in the same category (Buildings & townships): 9 approved, 1 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 82 acres, this one is larger than 90% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandigarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bulk Material Market by Estate Office Chandigarh — cleared for impact study, 0 m away
- Proposed 2nd Fruit, Vegetable and Grain Market at Sector 39, Chandigarh by… — environmental approval granted, 700 m away
- Regarding NOC for laying of 900mm (36")i/d RCC NP-3 Pipe line for connection… — more information requested, 1.7 km away
- Integrated Solid Waste Management System at Dadu Majra, Chandigarh — environmental approval granted, 2.7 km away
- Integrated Solid Waste Management System at Dadu Majra, Chandigarh — cleared for impact study, 2.7 km away
- Retail Outlet (Petrol Pump) — lapsed, 3 km away
- Animal Carcass Plant, Chandigarh — lapsed, 3.2 km away
- Providing Street Lighting Through Underground Cable on Road Along Dhanas Lake — lapsed, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.