Quick answers
What is this project?
Common Bio-Medical Waste Treatment Facility at Plot no. C-10, SMA Industrial Area, Delhi by M/s Gradus Hospitality Pvt. Ltd is a proposed waste management project in Haider Pur, Saraswati Vihar, North West, Delhi. The site covers 0.5 acres.
Who is building it?
The applicant is Gradus Hospitality Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Haider Pur, Saraswati Vihar, North West, Delhi.
How big is it?
It has a stated cost of ₹9.9 crore and a site of 0.5 acres.
When was it filed?
The application was filed on 11 May 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 20 Jul 2026 |
| Application filed | 11 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Gradus Hospitality Private Limited |
| Land area | 2,100 m² |
| Project cost | ₹9.9 crore |
| Village / locality | Haider Pur |
| Taluk / tehsil | Saraswati Vihar |
| District | North West |
| State | Delhi |
| Location from | Site boundary on record |
| Our reference | WID-DL-00185 |
In context
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Haider Pur, Saraswati Vihar, North West, Delhi. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Waste management project by M/s. SMS Water Grace BMW Pvt. Ltd. proposes a… — more information requested, 250 m away
- Waste management project by M/s. SMS Water Grace BMW Pvt. Ltd. proposes a… — lapsed, 550 m away
- Waste management project by M/s. SMS Water Grace BMW Pvt. Ltd. proposes a… — cleared for impact study, 550 m away
- Rejuvenation of Dry Munak Canal by Construction of Inspection Road and Wheel… — more information requested, 2 km away
- Rejuvenation of Dry Munak Canal by Construction of Inspection Road and Wheel… — more information requested, 2 km away
- Boundary Wall and Beautification of Dry Munak Canal From Down-Stream of Outer… — lapsed, 2.1 km away
- Widening of Road From Prembari Pull to Singhalpur Village Labour Chowk… — more information requested, 2.9 km away
- Six-Lane Bridge over the Dry Munak Canal, connecting Shalimar Bagh and… — lapsed, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.