What is Developing? Open the mapMap

LapsedBuildings & townships · Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu

Proposed residential cum commercial construction project Jas Luxuria proposed by Shree Ashvinsinh M Paramr

Proposed residential cum commercial construction project Jas Luxuria proposed by Shree Ashvinsinh M Paramr is a lapsed building project in Silvassa, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 12.3 acres. Its stated project cost is ₹116 crore. As of 27 Nov 2026, its status is “Lapsed” (since 10 Nov 2026).

See it on the live map All projects in Dadra & Nagar Haveli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed residential cum commercial construction project Jas Luxuria proposed by Shree Ashvinsinh M Paramr is a lapsed building project in Silvassa, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 12.3 acres.

Who is building it?

The applicant is Ashwinsinh Mohansinh Parmar.

Has it been approved?

No. The application was lapsed on 10 Nov 2026, so it is no longer under consideration.

Where is it?

In Silvassa, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu.

How big is it?

It has a stated cost of ₹116 crore and a site of 12.3 acres.

When was it filed?

The application was filed on 27 Apr 2026.

Project details

StatusLapsed
Status since10 Nov 2026
Application filed27 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantAshwinsinh Mohansinh Parmar
Land area12.3 acres (5 ha)
Project cost₹116 crore
Village / localitySilvassa
Taluk / tehsilDadra & Nagar Haveli
DistrictDadra & Nagar Haveli
StateDadra and Nagar Haveli and Daman and Diu
Location fromSite boundary on record
Our referenceWID-DN-00062

In context

52 applications in Dadra & Nagar Haveli since January 2022 are in the same category (Buildings & townships): 27 approved, 12 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 12.3 acres, this one is larger than 79% of them.

38 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Silvassa, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.