Quick answers
What is this project?
Sili Fatak to Randhe Road Umarkui Connectivity, IMP Power, Sayli & Siddhant Ispat, Umarkui Connectivity & Jackson Industry, Athola Connectivity is an approved pipeline project in Umbarkui, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 2.3 acres.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 7 Nov 2026), as of 27 Nov 2026.
Where is it?
In Umbarkui, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu.
How big is it?
It has a stated cost of ₹7 crore; a site of 2.3 acres and 2.3 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 26 Dec 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 7 Nov 2026 |
| Application filed | 26 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 2.3 acres (0.9 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹7 crore |
| Village / locality | Umbarkui |
| Taluk / tehsil | Dadra & Nagar Haveli |
| District | Dadra & Nagar Haveli |
| State | Dadra and Nagar Haveli and Daman and Diu |
| Location from | Site boundary on record |
| Our reference | WID-DN-00090 |
In context
13 applications in Dadra & Nagar Haveli since January 2022 are in the same category (Pipelines): 7 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 2.3 acres, this one is larger than 69% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Umbarkui, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest land (PF/RF) for the Laying of 11KV Underground HDD… — forest land use approved, 1.4 km away
- Diversion of Forest Land for the laying of 11KV Underground HDD Electrical… — lapsed, 1.4 km away
- Laying of 11KV HDD Underground Electric Cables from Silli Substation to… — lapsed, 1.4 km away
- The New Industrial Building Construction Projects of Gulnar Plastics Private… — more information requested, 1.5 km away
- Diversion of Forest Land for the Laying of 11KV HDD Electrical Cables from… — forest land use approved, 1.7 km away
- Umarkui Over Head to Under Ground Electrical Line — lapsed, 1.8 km away
- Industrial project by M/s. Apar Industries Ltd. (Conductor Division) — lapsed, 2 km away
- Dadra Nagar Havelli 4G Sat USO 2 Others — more information requested, 2 km away
More from Gujarat Gas Limited in Dadra & Nagar Haveli
- Diversion of 0.2278 hectare Protected Forest land for laying 6" dia.… — in-principle approval, conditions pending
- Natural Gas Distribution pipeline Networks by M/s. Gujarat Gas Limited at… — environmental approval granted
- 125/90 Mm Dia Pe Pipeline Parallel & Across to Road Side Strip Plantation… — in-principle approval, conditions pending
- Gas Distribution Network in DNH GA (Vasona Char Rasta to Khanvel Petrol Pump… — forest land use approved
- Gas Distribution Network in DNH GA (Jhaveri Flexo India Ltd. Connectivity) — more information requested
- Natural Gas Distribution pipeline Networks by M/s. Gujarat Gas Limited at… — cleared for impact study
13 Gujarat Gas projects in Dadra & Nagar Haveli
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.