Quick answers
What is Torrent Power?
Torrent Power is a lapsed power project in Silvassa, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 0.1 acres.
Who is building it?
The applicant is P.D. Construction.
Has it been approved?
No. The application was lapsed on 20 Jul 2023, so it is no longer under consideration.
Where is it?
In Silvassa, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu.
How big is it?
It has a stated cost of ₹1 lakh; a site of 0.1 acres and 1,890 m² of forest land.
When was it filed?
The application was filed on 13 Apr 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Jul 2023 |
| Application filed | 13 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | P.D. Construction |
| Land area | 500 m² |
| Forest land | 1,890 m² |
| Project cost | ₹1 lakh |
| Village / locality | Silvassa |
| Taluk / tehsil | Dadra & Nagar Haveli |
| District | Dadra & Nagar Haveli |
| State | Dadra and Nagar Haveli and Daman and Diu |
| Location from | Site boundary on record |
| Our reference | WID-DN-00140 |
In context
18 applications in Dadra & Nagar Haveli since January 2022 are in the same category (Power): 7 approved, 2 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.1 acres, this one is smaller than 81% of them.
47 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Silvassa, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for the Laying of Underground 11KV Underground HDD… — forest land use approved, 350 m away
- Krishna Tower — environmental approval granted, 1.6 km away
- Krishna Tower — withdrawn, 1.6 km away
- Diversion of Protected Forest land for the Laying of 11KV Underground HDD… — forest land use approved, 1.9 km away
- Sahaj Shangrila — environmental approval granted, 2 km away
- Pramukh Swagat 2 — environmental approval granted, 2.1 km away
- Shri Chhatrasinh Mohansinh Chauhan (Residential Project) — more information requested, 2.1 km away
- Proposed Residential cum Commercial Project Horizon City by JN Infra — environmental approval granted, 2.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.