Quick answers
What is this project?
Diversion of Forest Land (PF) for the laying of Bharti Airtel Underground Optical Fiber Cable (OFC) along the Amli- Sayli- Gujarat Border Road in Dadra and Nagar Haveli is a lapsed telecom project in Saili, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 0.8 acres.
Who is building it?
The applicant is Mohammad Irfan Shaikh.
Has it been approved?
No. The application was lapsed on 7 Mar 2025, so it is no longer under consideration.
Where is it?
In Saili, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu.
How big is it?
It has a stated cost of ₹35 lakh; a site of 0.8 acres and 3,400 m² of forest land.
When was it filed?
The application was filed on 1 Jan 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 Mar 2025 |
| Application filed | 1 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mohammad Irfan Shaikh |
| Land area | 3,400 m² |
| Forest land | 3,400 m² |
| Project cost | ₹35 lakh |
| Village / locality | Saili |
| Taluk / tehsil | Dadra & Nagar Haveli |
| District | Dadra & Nagar Haveli |
| State | Dadra and Nagar Haveli and Daman and Diu |
| Location from | Site boundary on record |
| Our reference | WID-DN-00144 |
In context
5 applications in Dadra & Nagar Haveli since January 2022 are in the same category (Telecom): 0 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
43 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saili, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening of Existing road from SSR College (Ch4/0 to Canal Junction 5/5 Km.) — forest land use approved, 250 m away
- 125/90 Mm Dia Pe Pipeline Parallel & Across to Road Side Strip Plantation… — in-principle approval, conditions pending, 250 m away
- Construction of 220 kV D/C Vapi-II – Sayali Transmission Line — under wildlife review, 850 m away
- Construction of 220 kV D/C Vapi-II – Sayali Transmission Line — lapsed, 850 m away
- "Eden Court" — environmental approval granted, 1.6 km away
- Expansion of Factory Building by Blue Star Limited. — environmental approval granted, 1.6 km away
- Industrial project by M/s. Madelin Enterprises Pvt. Ltd. — environmental approval granted, 1.7 km away
- Dadra Nagar Havelli 4G Sat Wildlife — lapsed, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.