Quick answers
What is this project?
Diversion of Reserved Forest Land for the Construction of Approach Road, Laying of Underground Drinking Water Pipeline and Electric line to the Survey No.73/1 (Old Survey No : 20/1/2/1/1) is a lapsed road project in Sindoni, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 0.3 acres.
Who is building it?
The applicant is Ami Sunilkumar Daru.
Has it been approved?
No. The application was lapsed on 5 Jul 2026, so it is no longer under consideration.
Where is it?
In Sindoni, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu.
How big is it?
It has a stated cost of ₹25 lakh; a site of 0.3 acres and 1,430 m² of forest land.
When was it filed?
The application was filed on 26 May 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Jul 2026 |
| Application filed | 26 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ami Sunilkumar Daru |
| Land area | 1,400 m² |
| Forest land | 1,430 m² |
| Project cost | ₹25 lakh |
| Village / locality | Sindoni |
| Taluk / tehsil | Dadra & Nagar Haveli |
| District | Dadra & Nagar Haveli |
| State | Dadra and Nagar Haveli and Daman and Diu |
| Location from | Site boundary on record |
| Our reference | WID-DN-00160 |
In context
24 applications in Dadra & Nagar Haveli since January 2022 are in the same category (Roads & highways): 5 approved, 7 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 3.2 years from filing to approval. At 0.3 acres, this one is smaller than 64% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sindoni, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Reserved Forest/Protected Forest Land for the Laying of… — more information requested, 2 km away
- Diversion of Reserved forest land for Upgradation and Strengthening of… — lapsed, 2.2 km away
- Diversion of Reserved Forest Land for the Construction of UGSRs, ESRs and BPT… — lapsed, 3.7 km away
- Diversion of Reserved Forest/Protected Forest Land for the Laying of… — more information requested, 4.8 km away
- Construction of Tribal Boys Hostel — lapsed, 4.9 km away
- Dadra Nagar Havelli 4G Sat USOF — lapsed, 5.6 km away
- Dadra Nagar Havelli 4G Sat USO — forest land use approved, 5.6 km away
- Diversion of Reserved Forest Land for the Up-gradation and Widening of Vansda-… — lapsed, 5.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.