Quick answers
What is Proposed Residential Development "Thousand Palms"?
Proposed Residential Development "Thousand Palms" is an approved building project in Sankval, Mormugao, South Goa, Goa. The site covers 3.1 acres.
Who is building it?
The applicant is Ashoka Infraways Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 May 2023), as of 27 Nov 2026.
Where is it?
In Sankval, Mormugao, South Goa, Goa.
How big is it?
It has a stated cost of ₹46.3 crore and a site of 3.1 acres.
When was it filed?
The application was filed on 16 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Residential Development "Thousand Palms"
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 May 2023 |
| Application filed | 16 May 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Ashoka Infraways Limited |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹46.3 crore |
| Village / locality | Sankval |
| Taluk / tehsil | Mormugao |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00036 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 22 Aug 2026 | Environmental approval granted | 3.1 acres | ₹46.3 crore |
| Expansion filed 16 May 2023 (this page) | Environmental approval granted | 3.1 acres | ₹46.3 crore |
What the filings say
What is planned
The applicant, Ashoka Infraways Limited, proposes a residential group housing development named "Thousand Palms" in Sancoale, Goa. The project is an expansion and amendment of a previously approved residential complex. The development is divided into two phases. Phase I, which is largely complete, consists of five blocks (Blocks 1, 6, 7, 8, and 9) containing 74 dwelling units. Phase II involves the construction of five additional blocks (Blocks 2, 3, 3A, 4, and 5) containing 94 dwelling units.
According to the project report, the total built-up area for the project is 24,220.76 square metres, situated on a plot of 1.5 hectares (3.70 acres). The revised proposal for Phase II includes 79 two-bedroom units and 15 three-bedroom units. Blocks 10 and 11, which were part of earlier plans, have been omitted from the current construction proposal to rationalise the environmental load and suit market conditions.
Project Configuration
| Component | Details |
|---|---|
| Total Plot Area | 15,000.00 sq.m (1.50 hectares) |
| Total Built-up Area | 24,220.76 sq.m |
| Total Dwelling Units | 168 (Phase I: 74; Phase II: 94) |
| Building Height | Stilt + 5 Floors (approx. 15 metres) |
| Total Population | 769 persons |
| Open Space | 2,250.00 sq.m (15%) |
| Parking Provided | 112 slots (Phase I) + 110 slots (Phase II) |
Layout and design
The site layout features clustered residential blocks with a central landscape zone and peripheral plantations. Internal circulation is managed by 6-metre wide roads. The buildings are designed as stilt-plus-five-floor structures. The design incorporates energy-efficient features such as optimal building orientation for natural light and ventilation, LED lighting in common areas, and the use of reflective materials to reduce heat gain. The stilt floors are primarily dedicated to parking.
Land and surroundings
The project is located at Survey No. 143/1-A-1-A in Sancoale Village, Mormugao. The site is characterized as a developed coastal urban region. The topography is flat to gently sloping with silty clay soil. The applicant states that the site does not fall under forest land, wildlife habitats, or Coastal Regulation Zone (CRZ) areas. Surrounding land use is predominantly residential and semi-urban.
Water, power and access
The total domestic water requirement is estimated at 103.82 kilolitres per day (KLD). Fresh water is to be sourced from authorized supply sources, supplemented by treated wastewater for non-potable uses. The project is designed for Zero Liquid Discharge (ZLD). A Sewage Treatment Plant (STP) with a capacity of 120 KLD using Moving Bed Biofilm Reactor (MBBR) technology is planned to treat approximately 83.06 KLD of generated sewage.
Power will be supplied by the Goa Electricity Board. The expected connected load is 840 kW, with a maximum demand load of 580 kW. A 200 kVA Diesel Generator (DG) set is proposed for backup power, along with three 500 kVA transformers.
Environmental safeguards
- Waste Management: Solid waste generation is estimated at 384.50 kg/day. Organic waste (230.70 kg/day) will be treated in an on-site Organic Waste Converter (OWC) to produce manure for landscaping. Inorganic waste (153.80 kg/day) will be handed over to authorized recyclers.
- Rainwater Harvesting: The plan includes seven groundwater recharge pits to manage stormwater and replenish the water table.
- Greenbelt: The applicant proposes to maintain 2,250 square metres of open space (15% of the plot). The plan includes planting approximately 364 new trees, bringing the total tree count on the plot to 534.
- Air and Noise: Mitigation measures include regular water sprinkling during construction, acoustic enclosures for the DG set, and peripheral plantations to act as noise and dust barriers.
Timeline
Construction for Phase I (Blocks 1, 6, 7, 8, and 9) was initiated in 2015. An Occupancy Certificate for these 70 residential flats was received on 7 September 2020. A supplemental Occupancy Certificate for 4 additional units was received on 27 July 2022. As of the 2026 filing, Phase II is in the pre-construction or partial development stage, with the applicant seeking an amendment to the Environmental Clearance to reflect the revised unit configuration and building omissions.
Residential Development Thousand Palms site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
59 applications in South Goa since January 2022 are in the same category (Buildings & townships): 23 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 3.1 acres, this one is smaller than 55% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sankval, Mormugao, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential Development "Thousand Palms" — environmental approval granted, 0 m away
- Hamlet Residences - A Residential cum Commercial Development by Zuari… — lapsed, 850 m away
- Hamlet Residences - A Residential cum Commercial Development by Zuari… — withdrawn, 850 m away
- Request for transfer of Environmental Clearance issued for revamp with product… — under environmental review, 950 m away
- Proposed Distillery Unit for the Production of Malt Spirit (1.5 KLPD), Gin… — cleared for impact study, 1.1 km away
- Proposed Residential Construction Project "HAMLET TOWERS" At Survey No,… — environmental approval granted, 1.1 km away
- Proposed expansion of existing infrastructure at BITS Pilani, K K Birla Goa… — under environmental review, 1.3 km away
- Proposed expansion of existing infrastructure at BITS Pilani, K K Birla Goa… — under environmental review, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.