Environmental approval grantedBuildings & townships · South Goa, Goa

Proposed Residential Development "Thousand Palms"

Proposed Residential Development "Thousand Palms" is an approved building project in Sankval, Mormugao, South Goa, Goa. The site covers 3.1 acres. Its stated project cost is ₹46.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 16 May 2023).

See it on the live map All projects in South Goa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Proposed Residential Development "Thousand Palms"?

Proposed Residential Development "Thousand Palms" is an approved building project in Sankval, Mormugao, South Goa, Goa. The site covers 3.1 acres.

Who is building it?

The applicant is Ashoka Infraways Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 16 May 2023), as of 27 Nov 2026.

Where is it?

In Sankval, Mormugao, South Goa, Goa.

How big is it?

It has a stated cost of ₹46.3 crore and a site of 3.1 acres.

When was it filed?

The application was filed on 16 May 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Residential Development "Thousand Palms"

Project details

StatusEnvironmental approval granted
Status since16 May 2023
Application filed16 May 2023
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantAshoka Infraways Limited
Land area3.1 acres (1.3 ha)
Project cost₹46.3 crore
Village / localitySankval
Taluk / tehsilMormugao
DistrictSouth Goa
StateGoa
Location fromSite boundary on record
Our referenceWID-GA-00036

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 22 Aug 2026Environmental approval granted3.1 acres₹46.3 crore
Expansion filed 16 May 2023 (this page)Environmental approval granted3.1 acres₹46.3 crore

What the filings say

What is planned

The applicant, Ashoka Infraways Limited, proposes a residential group housing development named "Thousand Palms" in Sancoale, Goa. The project is an expansion and amendment of a previously approved residential complex. The development is divided into two phases. Phase I, which is largely complete, consists of five blocks (Blocks 1, 6, 7, 8, and 9) containing 74 dwelling units. Phase II involves the construction of five additional blocks (Blocks 2, 3, 3A, 4, and 5) containing 94 dwelling units.

According to the project report, the total built-up area for the project is 24,220.76 square metres, situated on a plot of 1.5 hectares (3.70 acres). The revised proposal for Phase II includes 79 two-bedroom units and 15 three-bedroom units. Blocks 10 and 11, which were part of earlier plans, have been omitted from the current construction proposal to rationalise the environmental load and suit market conditions.

Project Configuration

ComponentDetails
Total Plot Area15,000.00 sq.m (1.50 hectares)
Total Built-up Area24,220.76 sq.m
Total Dwelling Units168 (Phase I: 74; Phase II: 94)
Building HeightStilt + 5 Floors (approx. 15 metres)
Total Population769 persons
Open Space2,250.00 sq.m (15%)
Parking Provided112 slots (Phase I) + 110 slots (Phase II)

Layout and design

The site layout features clustered residential blocks with a central landscape zone and peripheral plantations. Internal circulation is managed by 6-metre wide roads. The buildings are designed as stilt-plus-five-floor structures. The design incorporates energy-efficient features such as optimal building orientation for natural light and ventilation, LED lighting in common areas, and the use of reflective materials to reduce heat gain. The stilt floors are primarily dedicated to parking.

Land and surroundings

The project is located at Survey No. 143/1-A-1-A in Sancoale Village, Mormugao. The site is characterized as a developed coastal urban region. The topography is flat to gently sloping with silty clay soil. The applicant states that the site does not fall under forest land, wildlife habitats, or Coastal Regulation Zone (CRZ) areas. Surrounding land use is predominantly residential and semi-urban.

Water, power and access

The total domestic water requirement is estimated at 103.82 kilolitres per day (KLD). Fresh water is to be sourced from authorized supply sources, supplemented by treated wastewater for non-potable uses. The project is designed for Zero Liquid Discharge (ZLD). A Sewage Treatment Plant (STP) with a capacity of 120 KLD using Moving Bed Biofilm Reactor (MBBR) technology is planned to treat approximately 83.06 KLD of generated sewage.

Power will be supplied by the Goa Electricity Board. The expected connected load is 840 kW, with a maximum demand load of 580 kW. A 200 kVA Diesel Generator (DG) set is proposed for backup power, along with three 500 kVA transformers.

Environmental safeguards

Timeline

Construction for Phase I (Blocks 1, 6, 7, 8, and 9) was initiated in 2015. An Occupancy Certificate for these 70 residential flats was received on 7 September 2020. A supplemental Occupancy Certificate for 4 additional units was received on 27 July 2022. As of the 2026 filing, Phase II is in the pre-construction or partial development stage, with the applicant seeking an amendment to the Environmental Clearance to reflect the revised unit configuration and building omissions.

Residential Development Thousand Palms site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Residential Development Thousand Palms: Site plan: building blocks, swimming pool, and internal road layout (preview)🔒 Sign in free to see it
Site plan: building blocks, swimming pool, and internal road layout
Residential Development Thousand Palms: Parking layout: stilt floor parking slots and internal access roads (preview)🔒 Sign in free to see it
Parking layout: stilt floor parking slots and internal access roads
Residential Development Thousand Palms: Building elevations and sections for Block 5 and society hall (preview)🔒 Sign in free to see it
Building elevations and sections for Block 5 and society hall
Residential Development Thousand Palms: Typical floor plans and sections for residential Blocks 2, 3, and 4 (preview)🔒 Sign in free to see it
Typical floor plans and sections for residential Blocks 2, 3, and 4

In context

59 applications in South Goa since January 2022 are in the same category (Buildings & townships): 23 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 3.1 acres, this one is smaller than 55% of them.

16 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sankval, Mormugao, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.