Quick answers
What is Zuari River Sand Mining Zone-5?
Zuari River Sand Mining Zone-5 is an approved mining project in Makazan, Salcete, South Goa, Goa. The site covers 2.4 acres.
Who is building it?
The applicant is The Director of Mines.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Feb 2025), as of 27 Nov 2026.
Where is it?
In Makazan, Salcete, South Goa, Goa.
How big is it?
It has a site of 2.4 acres.
When was it filed?
The application was filed on 12 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Feb 2025 |
| Application filed | 12 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | The Director of Mines |
| Land area | 2.4 acres (1 ha) |
| Village / locality | Makazan |
| Taluk / tehsil | Salcete |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00086 |
In context
67 applications in South Goa since January 2022 are in the same category (Mining): 36 approved, 23 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.4 acres, this one is smaller than 82% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Makazan, Salcete, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Basalt Quarry bearing lease no. 04/Basalt/90 & 03/Basalt/07 (renewed… — environmental approval granted, 7.1 km away
- Proposed Enhancement in Production Capacity of Basalt Stone & Murrum Quarry… — environmental approval granted, 7.2 km away
- Extension of Validity of Environment Clearance for Basalt Stone Quarry bearing… — environmental approval granted, 7.2 km away
- Extension of Validity of Environment Clearance for Basalt Stone Quarry bearing… — lapsed, 7.2 km away
- Proposed Enhancement in Production Capacity of Basalt Stone & Murrum Quarry… — environmental approval granted, 7.2 km away
- Antorem Basalt Quarry — environmental approval granted, 7.7 km away
- Pricila Minerals — under environmental review, 8.1 km away
- Handling of Iron Ore dump Situated Outside the Lease Area on Private property… — environmental approval granted, 8.2 km away
All 14 The Director of Mines projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.