Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Oct 2024 |
| Application filed | 9 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Vedanta Limited Value Addition Business |
| Land area | 176.4 acres (71.4 ha) |
| Project cost | ₹806 crore |
| Village / locality | Navelim |
| Taluk / tehsil | Bicholim |
| District | North Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00112 |
In context
14 applications in North Goa since January 2022 are in the same category (Industry): 7 approved, 4 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 176.4 acres, this one is larger than 79% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Navelim, Bicholim, North Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Value Added Business, Vedanta Iron and Steel — lapsed, 0 m away
- Proposed expansion in the Ductile Iron (DI) plant capacity from 0.36 to 0.42… — initial checks, 0 m away
- Proposed expansion in the Ductile Iron (DI) plant capacity from 0.36 to 0.42… — initial checks, 0 m away
- Proposed Expansion of MS Billet and Hot Rolling Product Manufacturing Facility… — under environmental review, 1.3 km away
- Mandovi River Sand Mining Zone-7 — environmental approval granted, 1.3 km away
- Proposed Expansion of Production Capacity of M.S.Billet & Hotrolled Products… — more information requested, 1.3 km away
- Mandovi River Sand Mining Zone-6 — environmental approval granted, 1.8 km away
- Mandovi River Sand Mining Zone-8 — environmental approval granted, 2.3 km away
More from Vedanta Limited Value Addition Business in North Goa
- Proposed expansion in the Ductile Iron (DI) plant capacity from 0.36 to 0.42… — initial checks
- Proposed expansion in the Ductile Iron (DI) plant capacity from 0.36 to 0.42… — initial checks
All 3 Vedanta Limited Value projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.