One of 2 filings for this project. The project's main page, with every filing and where each stands: Residential Cum Commercial scheme in Survey nos. 225/1&4, 227 and 234/2 at Odxel,…
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Apr 2026 |
| Application filed | 17 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Emgee Housing Private Limited |
| Land area | 13.6 acres (5.5 ha) |
| Project cost | ₹9.4 crore |
| Village / locality | Taleigao (Og) (Part) |
| Taluk / tehsil | Tiswadi |
| District | North Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00128 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 17 Apr 2024 (this page) | Lapsed | 13.6 acres | ₹9.4 crore |
| Early planning filed 16 May 2023 | Cleared for impact study | 13.6 acres | ₹9.4 crore |
In context
74 applications in North Goa since January 2022 are in the same category (Buildings & townships): 39 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 13.6 acres, this one is larger than 80% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Taleigao (Og) (Part), Tiswadi, North Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Cum Commercial scheme in Survey nos. 225/1&4, 227 and 234/2 at… — cleared for impact study, 0 m away
- Residential cum Commercial Project by Adwalpalkar Constructions and Resorts… — lapsed, 700 m away
- Environmental Clearance for Proposed Construction of Commercial and Hotel… — environmental approval granted, 1.5 km away
- Ahoy Marina Facility for Crafts, Small Boats, and Yachts by Mormugao Port… — lapsed, 1.6 km away
- Ahoy Marina Facility for Crafts, Small Boats and Yachts by Mormugao Port… — returned to applicant, 1.6 km away
- Environmental Clearance for proposed residential project located on land… — lapsed, 2.1 km away
- Environmental Clearance for proposed residential project located on land… — withdrawn, 2.1 km away
- Hotel Building on Plot Bearing Survey No. 14/1, 14/2, 15/1, 16/1, 17/1, 17/2,… — environmental approval granted, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.