Quick answers
What is this project?
Residential-cum-commercial project 'Ferrum Heights' on property bearing Chalta Nos. 7, 8, and 24 of PT Sheet No. 25 in Margao, Salcete, Goa, by M/s Edifice Developers is an approved mixed-use project in Madgaon, Salcete, South Goa, Goa. It plans 2 towers of up to 12 floors on 0.9 acres.
Who is building it?
The applicant is Edifice Developers.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Sept 2025), as of 27 Nov 2026.
Where is it?
In Madgaon, Salcete, South Goa, Goa.
How big is it?
It has a stated cost of ₹68 crore and a site of 0.9 acres.
When was it filed?
The application was filed on 26 May 2025.
Project details
| Official title | Construction of the residential-cum-commercial project 'Ferrum Heights' on property bearing Chalta Nos. 7, 8, and 24 of PT Sheet No. 25 in Margao, Salcete, Goa, by M/s Edifice Developers. |
|---|---|
| Status | Environmental approval granted |
| Status since | 18 Sept 2025 |
| Application filed | 26 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Edifice Developers |
| Use | Mixed use |
| Towers | 2 |
| Floors (tallest) | 12 |
| Basements | 1 |
| Height | 38 m |
| Parking spaces | 160 |
| Land area | 3,600 m² |
| Built-up area | 22,639 m² (2,43,684 sq ft) |
| Plot area | 3,595 m² (38,696 sq ft) |
| Project cost | ₹68 crore |
| Village / locality | Madgaon |
| Taluk / tehsil | Salcete |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00163 |
What the filings say
What is planned
M/s Edifice Developers proposes to construct 'Ferrum Heights', a residential-cum-commercial project in Margao, South Goa. The development is planned on an amalgamated plot of 3,595 square metres (0.88 acres) with a total built-up area of 22,639.33 square metres.
The project consists of two blocks, Building A and Building B, with the following configurations:
- Building A: Ground floor plus 11 upper floors. It includes one commercial shop on the ground floor, 19 residential units (2BHK), one 4BHK unit, and a swimming pool.
- Building B: Basement, two stilt levels (L1 and L2) for parking, and 12 upper floors. It contains 132 residential units (2BHK), a second swimming pool, a society office, a gymnasium, and a community hall on the 12th floor.
The total residential capacity is 152 units. The project is estimated to accommodate 795 individuals, including 762 residents, 30 visitors, and 3 staff members.
Layout and design
The site plan shows a rectangular building footprint with internal circulation roads and ramps. Building B features a basement and two stilt levels dedicated to parking, providing a total of 160 car parking spaces. The design incorporates 220 square metres (6.12% of the plot) for a peripheral greenbelt.
Sustainable design elements include rooftop solar photovoltaic systems with a total capacity of 23 kWp (9 kWp on Building A and 14 kWp on Building B) to power common utilities like lifts and corridor lighting. The project also features a rainwater harvesting tank with a capacity of 252 cubic metres.
Land and surroundings
The project is located on Chalta Nos. 7, 8, and 24 of PT Sheet No. 25 in Madgaon. The land is designated as a Special Commercial Zone under the Margao Outline Development Plan 2031. The site has varying contours with elevations ranging from 23.5 metres to 31.5 metres.
Connectivity to the site is provided by a 10-metre wide access road. The property is approximately 0.26 km from the Margao Bypass Road (NH-66) and 3.23 km from the Madgaon Railway Station. The Sal River is located 1.82 km from the site, and the Arabian Sea is 6.25 km away.
Water, power and access
Water: During the operational phase, the total water requirement is estimated at 104.9 kilolitres per day (KLD). This includes 68.81 KLD for domestic use, 34.65 KLD for flushing, 0.36 KLD for landscaping, and 1.08 KLD for swimming pool makeup. Water will be sourced from the Public Works Department (PWD) and supplemented by registered water tankers.
Power: The total connected load is 24,200 kW, sourced from the Goa Electricity Department. Two diesel generator sets of 1,500 kVA each will be installed for backup power.
Waste Management: Wastewater generation is estimated at 89.70 KLD, which will be directed to the common sewerage network leading to the Shirvodem Sewage Treatment Plant (STP) in Margao. Solid waste is estimated at 383.15 kg/day. Organic waste (153.26 kg/day) will be treated on-site using an Organic Waste Converter, while inorganic waste will be collected by the local panchayat agency.
Environmental safeguards
The applicant proposes several mitigation measures to manage environmental impacts:
- Air: Regular water sprinkling for dust suppression and use of Ready-Mix Concrete during construction.
- Noise: Installation of acoustic enclosures for DG sets and temporary noise barriers during construction.
- Drainage: An internal storm water drainage system will discharge runoff into the public drain, eventually leading toward the Sal River.
- Greenery: Plantation of 55 trees, exceeding the statutory requirement of 45 trees. Species selected include Neem, Sita Ashok, and Akashneem.
Timeline
The applicant's project report states that construction is intended to start immediately after obtaining environmental clearance. The scheduled completion date for the project is December 31, 2030.
| Item | Detail |
|---|---|
| Total Plot Area | 3,595.00 m² |
| Total Built-up Area | 22,639.33 m² |
| Total Residential Units | 152 |
| Total Commercial Units | 1 Shop |
| Total Parking Spaces | 160 |
| Max Occupancy | 795 persons |
| Operational Water Demand | 104.9 KLD |
| Solar Power Capacity | 23 kWp |
| Estimated Project Cost | ₹68 crore |
Edifice Developers Residential-cum-commercial Project 'Ferrum Heights' on Property Bearing Chalta Nos. 7, 8, and 24 of PT Sheet No. 25 in Margao, Salcete, Goa, site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
59 applications in South Goa since January 2022 are in the same category (Buildings & townships): 23 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.9 acres, this one is smaller than 75% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Madgaon, Salcete, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Quarrying of Laterite/Chira Stone in an area of 1.12 Ha. at Sy.No:… — environmental approval granted, 1.3 km away
- Residential cum Commercial Building project by M/s. Poetree Homes LLP on plot… — returned to applicant, 1.5 km away
- Residential cum Commerial Project at Plot Bearing P.T. Sheet No. 171 of Chalta… — under environmental review, 2.4 km away
- Residential Project situated at Chalta No. 1/2 of P.T. Sheet No. 129, Gogol,… — environmental approval granted, 2.5 km away
- Building project by M/S NANU ESTATES Pvt Ltd — environmental approval granted, 2.7 km away
- Residential cum Commercial Complex by M/s. Swapna Developers on property… — environmental approval granted, 3.9 km away
- Proposed Laterite Rubble Quarry of Lease Area 2 Ha Located on land bearing… — environmental approval granted, 4.4 km away
- Group Housing and Commercial Project "Akar Excelsior" — lapsed, 4.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.