Codli Mineral Block - XII, Auctioned Block Area: 377.0881 ha with Iron Ore production 3.50 Million TPA, OB/Waste 8.21 Million TPA (Total Excavation: 11.71 Million TPA) by JSW Steel Limited

Codli Mineral Block - XII, Auctioned Block Area: 377.0881 ha with Iron Ore production 3.50 Million TPA, OB/Waste 8.21 Million TPA (Total Excavation: 11.71 Million TPA) by JSW Steel Limited is a proposed mining project in Codli, Dharbandora, South Goa, Goa. The site covers 931.8 acres. Its stated project cost is ₹500 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 31 Dec 2025).

See it on the live map All projects in South Goa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Codli Mineral Block - XII, Auctioned Block Area: 377.0881 ha with Iron Ore production 3.50 Million TPA, OB/Waste 8.21 Million TPA (Total Excavation: 11.71 Million TPA) by JSW Steel Limited is a proposed mining project in Codli, Dharbandora, South Goa, Goa. The site covers 931.8 acres.

Who is building it?

The applicant is Jsw Steel LTD.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Codli, Dharbandora, South Goa, Goa.

How big is it?

It has a stated cost of ₹500 crore and a site of 931.8 acres.

When was it filed?

The application was filed on 5 Dec 2025.

Project details

Official titleCodli Mineral Block - XII, Auctioned Block Area: 377.0881 ha with Iron Ore production 3.50 Million TPA, OB/Waste 8.21 Million TPA (Total Excavation: 11.71 Million TPA) along with Installation 04 Crusher (3 Primary Crusher of 1 x 250 TPH & 2 x 90 TPH and 1 Secondary Crusher of 150 TPH) and 600 TPH Dry & 2 x 300 TPH Wet Beneficiation Plant with Throughput Capacity 3.50 Million TPA located at Village: Codli, Taluka: Dharbandora, District: South Goa (Goa) by JSW Steel Limited.
StatusReturned to applicant
Status since31 Dec 2025
Application filed5 Dec 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantJsw Steel LTD
Land area931.8 acres (377.1 ha)
Project cost₹500 crore
Village / localityCodli
Taluk / tehsilDharbandora
DistrictSouth Goa
StateGoa
Location fromSite boundary on record
Our referenceWID-GA-00178

In context

67 applications in South Goa since January 2022 are in the same category (Mining): 36 approved, 23 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 931.8 acres, this one is larger than 94% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 5,059.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 13 mining leases have applied within 5 km.

Where it is

Codli, Dharbandora, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jsw Steel LTD in South Goa

4 Jsw Steel projects in South Goa
All 97 Jsw Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.