Quick answers
What is BSNL GOA 4G Saturation Project?
BSNL GOA 4G Saturation Project is a lapsed project in Vichundrem, Sanguem, South Goa, Goa. The site covers 0.2 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Vichundrem, Sanguem, South Goa, Goa.
How big is it?
It has a stated cost of ₹2.5 crore; a site of 0.2 acres and 1,000 m² of forest land.
When was it filed?
The application was filed on 25 Jan 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 25 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 1,000 m² |
| Forest land | 1,000 m² |
| Project cost | ₹2.5 crore |
| Village / locality | Vichundrem |
| Taluk / tehsil | Sanguem |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00257 |
In context
31 applications in South Goa since January 2022 are in the same category (Other): 7 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 0.2 acres, this one is larger than 62% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vichundrem, Sanguem, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- One Time Permission for Construction of Residential House Upto 250 Sq Mts — lapsed, 600 m away
- Proposed Laterite Stone Quarry of Lease Area 0.5000 Ha Located on land bearing… — environmental approval granted, 1.1 km away
- Block XI- Curpem & Sulcorna Mineral Block. — under environmental review, 2.6 km away
- Curpem–Sulcorna Mineral Block-XI — initial checks, 2.6 km away
- Godbaem-Ou Cuttiem Curpem Mine — cleared for impact study, 2.8 km away
- Godbaem-Ou Cuttiem Curpem Mine — returned to applicant, 2.8 km away
- GOI USOF BSNL 4G Saturation Project at village Vichundrem — forest land use approved, 3.3 km away
- Residential House Up to 250 Sq. Mtrs. As Per the Moef&cc Guideline Dated… — initial checks, 4.5 km away
More from Mahesh Nair in South Goa
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- 4G Saturation at Village Viliena — under forest review
- 4G Saturation at Village Cumbari — under forest review
- 4G Saturation at Village Viliena — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.