Project details
| Status | Forest land use approved |
|---|---|
| Status since | 19 Sept 2025 |
| Application filed | 21 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹30 lakh |
| Village / locality | Malpon |
| Taluk / tehsil | Satari |
| District | North Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00288 |
In context
21 applications in North Goa since January 2022 are in the same category (Other): 6 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malpon, Satari, North Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- GOI USOF BSNL 4G Saturation Project at village Assodem — lapsed, 2.5 km away
- Laterite Stone Quarry with lease area 3.6 Ha located on land bearing Survey… — environmental approval granted, 4.7 km away
- GOI USOF BSNL 4G Saturation project at village Karmali Bk. — forest land use approved, 6.1 km away
- GOI USOF BSNL 4G Saturation Project at Caranzol — forest land use approved, 7.1 km away
- GOI USOF BSNL 4G Saturation Project at Caranzol — decision issued, 7.1 km away
- GOI USOF BSNL 4G Saturation Project at village Kumthal (Cuntol) — forest land use approved, 7.4 km away
- GOI USOF BSNL 4G Saturation Project at village Kumthal (Cuntol) — decision issued, 7.4 km away
- GOI USOF BSNL 4G Saturation Project at village Cudcem — forest land use approved, 9.2 km away
More from Mahesh Nair in North Goa
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — under wildlife review
- GOI USOF BSNL 4G Saturation Project at Codal — initial checks
- GOI USOF BSNL 4G Saturation Project at Codal — under wildlife review
- GOI USOF BSNL 4G Saturation Project at Codal — more information requested
- GOI USOF BSNL 4G Saturation Project at Codal — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.