What is Erection of GBT under USO 4G Saturation Project?
Erection of GBT under USO 4G Saturation Project is an approved building project in Corla, Quepem, South Goa, Goa. It plans 1 tower on 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 7 Mar 2025), as of 27 Nov 2026.
Where is it?
In Corla, Quepem, South Goa, Goa.
How big is it?
It has a stated cost of ₹30 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 29 Jun 2023.
Project details
| Official title | Proposal for Erection of GBT under USO 4G Saturation Project at Village Corla Dist South Goa |
|---|---|
| Status | Forest land use approved |
| Status since | 7 Mar 2025 |
| Application filed | 29 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Use | Other |
| Towers | 1 |
| Land area | 200 m² |
| Forest land | 200 m² |
| Plot area | 200 m² (2,153 sq ft) |
| Project cost | ₹30 lakh |
| Village / locality | Corla |
| Taluk / tehsil | Quepem |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00307 |
In context
59 applications in South Goa since January 2022 are in the same category (Buildings & townships): 23 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Corla, Quepem, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Land Acquisition and Construction of Road From Quiscond to Corla in V.P… — lapsed, 1.9 km away
- Land Acquisition and Construction of Road From Quiscond to Corla in V.P… — lapsed, 2.2 km away
- Land Acquisition and Construction of Road From Quiscond to Corla in V.P… — lapsed, 3.8 km away
- GOI USOF BSNL 4G Saturation project — forest land use approved, 4.4 km away
- Curpem–Sulcorna Mineral Block-XI — initial checks, 5.7 km away
- Block XI- Curpem & Sulcorna Mineral Block. — under environmental review, 5.7 km away
- GOI USOF BSNL 4G Saturation Project at village Vichundrem — forest land use approved, 6.1 km away
- GoI USOF BSNL 4G Saturation Project at Cotigao Aouli — forest land use approved, 6.2 km away
More from Mahesh Nair in South Goa
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- 4G Saturation at Village Viliena — under forest review
- 4G Saturation at Village Cumbari — under forest review
- 4G Saturation at Village Viliena — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.