Quick answers
What is GOI USOF BSNL 4G Saturation Project at Maulinguem?
GOI USOF BSNL 4G Saturation Project at Maulinguem is an approved project in Malingem, Sanguem, South Goa, Goa. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 22 Oct 2026), as of 27 Nov 2026.
Where is it?
In Malingem, Sanguem, South Goa, Goa.
How big is it?
It has a stated cost of ₹30 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 2 Jul 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 2 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹30 lakh |
| Village / locality | Malingem |
| Taluk / tehsil | Sanguem |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00308 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Jul 2025 (this page) | Forest land use approved | 0 acres | ₹30 lakh |
| New project filed 25 Dec 2024 | Under wildlife review | 0 acres | ₹30 lakh |
In context
31 applications in South Goa since January 2022 are in the same category (Other): 7 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 0 acres, this one is smaller than 96% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malingem, Sanguem, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- GOI USOF BSNL 4G Saturation Project at Maulinguem — under wildlife review, 0 m away
- Enhancement of Production Capacity of the Existing Basalt Stone Quarry from… — under environmental review, 2.6 km away
- Enhancement of Production Capacity of the Existing Basalt Stone Quarry from… — returned to applicant, 2.6 km away
- Extension of Validity of Environment Clearance for Basalt Stone Quarry bearing… — environmental approval granted, 2.6 km away
- Extension of Validity of Environment Clearance for Basalt Stone Quarry bearing… — lapsed, 2.6 km away
- Extension of validity of Environment Clearance for Basalt Stone Quarry bearing… — environmental approval granted, 2.9 km away
- GOI USOF BSNL 4G Saturation Project at Village Dudal — forest land use approved, 2.9 km away
- Extension of validity of Environment Clearance for Basalt Stone Quarry bearing… — environmental approval granted, 3 km away
More from Mahesh Nair in South Goa
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- 4G Saturation at Village Viliena — under forest review
- 4G Saturation at Village Cumbari — under forest review
- 4G Saturation at Village Viliena — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.