One of 2 filings for this project. The project's main page, with every filing and where each stands: Anil Bosco Manuel Pinto
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Mar 2026 |
| Application filed | 14 Jan 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Other |
| Applicant | Anil Pinto |
| Land area | 1,400 m² |
| Project cost | ₹10 lakh |
| Village / locality | Anjuna |
| Taluk / tehsil | Bardez |
| District | North Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00360 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Jan 2024 | Lapsed | 0.3 acres | ₹20 lakh |
| New project filed 14 Jan 2024 (this page) | Lapsed | 0.3 acres | ₹10 lakh |
In context
21 applications in North Goa since January 2022 are in the same category (Other): 6 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.3 acres, this one is larger than 76% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anjuna, Bardez, North Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Anil Bosco Manuel Pinto — lapsed, 0 m away
- Project by Bahay Luxury LLP — lapsed, 100 m away
- Tourism project by Riviera De Goa Resorts and Hotels Private Limited — coastal clearance granted, 600 m away
- Hotel Buildings ( Block A, B, C,d,e) Unstoried Porch and Swimming Pool — lapsed, 1.1 km away
- Application for CRZ Clearance for proposed construction of Hotel Buildings on… — coastal clearance granted, 1.1 km away
- Proposed Reconstruction of Temporary Shack in Property Bearing Survey N0:… — lapsed, 1.6 km away
- Proposed Five Star Resort — coastal clearance granted, 1.9 km away
- Proposed Five Star Resort — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.