Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Nov 2022 |
| Application filed | 17 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Safal Goyal Realty LLP |
| Land area | 83.2 acres (33.7 ha) |
| Project cost | ₹2,143.5 crore |
| Village / locality | Shela |
| Taluk / tehsil | 0 |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00011 |
What the filings say
What is planned
Safal Goyal Realty LLP is expanding and modifying its existing "Sky City" township in Shela, Ahmedabad. The project is a residential-cum-commercial development on a total land area of 42.17 hectares (104.20 acres). The applicant previously received environmental clearance in 2016 for a built-up area of 8,83,216.87 square metres; the new proposal increases this to 14,12,460.34 square metres.
The expanded project includes a mix of high-rise apartments, bungalows, and commercial units. The tallest buildings are planned to reach 37 floors above ground, with a maximum height of 131.1 metres.
Project Components:
- Residential Units: 3,512 flats and 438 bungalows.
- Commercial Units: 63 shops.
- Amenities: 18 community halls, four temple units, and six swimming pools.
- Parking: A total of 11,020 Equivalent Car Spaces (ECS) provided across three-level basements, hollow plinths, and surface areas.
Construction Status
The applicant reports that a significant portion of the project is already complete or under construction. Completed works include 413 blocks comprising 1,406 units (bungalows and apartments up to 14 floors). Another 54 blocks, including high-rises up to 21 floors, are currently under construction. The proposed expansion primarily adds 13 new high-rise blocks (Z8 to Z20) ranging from 32 to 37 floors.
Layout and design
The township is designed with a network of internal roads ranging from 7.5 metres to 30 metres in width. A 30-metre wide and an 18-metre wide Development Plan (DP) road pass through the site. The design incorporates energy-efficient features such as LED lighting in common areas, solar street lights, and solar water heaters for all 438 bungalows. To minimize the heat island effect for the tallest towers (32–37 floors), the applicant proposes a maximum wall-to-window ratio of 30%, roof-top thermal insulation, and high wind-resistant windows.
Land and surroundings
The project site is located in Shela village, Sanand Taluka. The land is partially developed. The surrounding area includes the Sardar Patel Ring Road approximately 0.8 km to the east and the S.G. Highway 4 km away. The Sabarmati River is located about 7 km to the southeast. While no wildlife sanctuaries are within a 10 km radius, the Thol Bird Sanctuary is situated 15 km to the northwest.
Water, power and access
Water: During the operation phase, the total water requirement is estimated at 3,264.7 kilolitres per day (KLD). Of this, 2,191.32 KLD will be fresh water supplied by the Ahmedabad Urban Development Authority (AUDA), while 1,073.38 KLD will be recycled from treated wastewater for flushing and horticulture.
Power: The total power demand is 19,000 KVA, to be sourced from Uttar Gujarat Vij Company Limited (UGVCL). For emergency backup, particularly for fire services, DG sets with a total capacity of 2,567.5 KVA are planned. The applicant also intends to install 150 kW of solar panels to meet part of the connected load.
Waste Management: A series of Sewage Treatment Plants (STPs) with a combined capacity of 2,491 KLD will treat wastewater. Solid waste generation is estimated at 10,530 kg per day. Organic waste will be processed in on-site Organic Waste Converters (OWC) to produce compost for the township's 4.94 hectares (12.21 acres) of green area.
Environmental safeguards
The applicant has proposed 85 percolation wells for rainwater harvesting to recharge groundwater, with an annual recharge capacity of 1,35,500 cubic metres. The landscaping plan includes planting 8,423 trees, of which 2,041 have already been planted. Species include Neem, Jamun, Gulmohar, and Asopalav. For fire safety, the project will include a 12,00,000-litre underground static water storage tank and additional terrace tanks for each block.
| Item | Detail |
|---|---|
| Total Land Area | 42.17 hectares (104.20 acres) |
| Net Plot Area | 33.69 hectares (83.25 acres) |
| Total Built-up Area | 14,12,460.34 square metres |
| Maximum Building Height | 131.1 metres |
| Tallest Building | 3B + G/HP + 37 Floors |
| Total Residential Units | 3,950 (3,512 flats + 438 bungalows) |
| Total Parking Provided | 11,020 ECS |
| Green Area Provided | 4.94 hectares (12.21 acres) |
| Estimated Project Cost | ₹2,143.5 crore |
Sky City site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 83.2 acres, this one is larger than 95% of them.
242 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shela, 0, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Samanvay Evoq — environmental approval granted, 550 m away
- Samanvay Evoq — initial checks, 550 m away
- Samanvay Evoq — withdrawn, 550 m away
- Samanvay Evoq — environmental approval granted, 550 m away
- Sun Sky View — environmental approval granted, 550 m away
- Amora — under environmental review, 600 m away
- Harvi Hibiscus — environmental approval granted, 750 m away
- Shaligram Prestige — environmental approval granted, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.