What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Surat, Gujarat

Milestone Ambience

Milestone Ambience is an approved building project in Vesu, Majura, Surat, Gujarat. The site covers 1.7 acres. Its stated project cost is ₹82 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 29 Nov 2022).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Milestone Ambience?

Milestone Ambience is an approved building project in Vesu, Majura, Surat, Gujarat. The site covers 1.7 acres.

Who is building it?

The applicant is Bhavya Developers.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 29 Nov 2022), as of 27 Nov 2026.

Where is it?

In Vesu, Majura, Surat, Gujarat.

How big is it?

It has a stated cost of ₹82 crore and a site of 1.7 acres.

When was it filed?

The application was filed on 29 Nov 2022.

Project details

StatusEnvironmental approval granted
Status since29 Nov 2022
Application filed29 Nov 2022
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantBhavya Developers
Land area1.7 acres (0.7 ha)
Project cost₹82 crore
Village / localityVesu
Taluk / tehsilMajura
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00097

What the filings say

What is planned

Bhavya Developers has received environmental approval for Milestone Ambience, a residential building project in the Vesu-Magdalla area of Surat. The applicant's conceptual plan describes a development consisting of five residential buildings, organized into six blocks, with a maximum height of 13 floors (43.42 metres).

The project is designed to provide 156 residential units. According to the built-up area summary, the total built-up area is 46,529.64 square metres, while the Floor Space Index (FSI) area is 27,321.34 square metres. The buildings are supported by two basement levels and a hollow plinth.

Planned infrastructural features include:

Layout and design

The project is situated on a plot of 0.7 hectares (1.72 acres). The ground coverage area is 2,336.08 square metres. The layout includes a common plot area of 698.44 square metres.

Parking is provided across the basement, hollow plinth, and ground levels. The applicant proposes a total of 329 Equivalent Car Spaces (ECS), which exceeds the National Building Code requirement of 156 spaces. The basement levels account for 304 spaces, while the hollow plinth provides 25 spaces.

Water, power and access

During the operation phase, the project will require 65 kilolitres per day (KLD) of fresh water, to be supplied by the Surat Municipal Corporation (SMC). Total water consumption is estimated at 112 KLD, which includes 47 KLD of recycled water for flushing and gardening.

A sewage treatment plant (STP) using Moving Bed Biofilm Reactor (MBBR) technology with a capacity of 100 KLD will be installed. Of the treated sewage, 40 KLD will be discharged into the SMC drainage line, while the remainder will be reused on-site.

The estimated electrical load is 800 KW, sourced from Dakshin Gujarat Vij Company Limited (DGVCL). For backup, the applicant plans to install three diesel generator sets of 125 KVA each. Energy conservation measures include the installation of 148 solar panels on the rooftops to provide 80 KW for common area lighting.

Access to the site is provided via two gates from an adjacent 45-metre wide road. Internal roads are designed with a width of 6 metres.

Environmental safeguards

The applicant proposes a green belt covering 700 square metres, representing approximately 10% of the plot area. A total of 110 trees are planned to be planted, including species such as Gulmohar, Jambu, and Ashopalav.

For solid waste management, an organic waste converter with a capacity of 200 kg/day will be installed to process kitchen waste into manure. Inorganic waste, estimated at 150-200 kg/day, will be collected and disposed of as per SMC practices.

Rainwater harvesting will be implemented through two recharge borewells. The storm drainage system is designed to cater to seasonal rain, with discharge primarily from the roof surfaces.

ItemDetail
Total Residential Units156
Total Built-up Area46,529.64 sq. mt.
FSI Area27,321.34 sq. mt.
Maximum Building Height43.42 m
Fresh Water Requirement65 KLD
STP Capacity100 KLD
Solar Power Generation80 KW
Total Parking Provided329 ECS

Milestone Ambience site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Milestone Ambience: Site plan and key plan: building blocks, common plot, and road access (preview)🔒 Sign in free to see it
Site plan and key plan: building blocks, common plot, and road access
Milestone Ambience: Ground floor layout plan showing building footprints and internal roads (preview)🔒 Sign in free to see it
Ground floor layout plan showing building footprints and internal roads
Milestone Ambience: Basement parking layout: first and second basement levels (preview)🔒 Sign in free to see it
Basement parking layout: first and second basement levels
Milestone Ambience: Elevation and section of Building Blocks C and D (preview)🔒 Sign in free to see it
Elevation and section of Building Blocks C and D

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.7 acres, this one is larger than 58% of them.

136 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vesu, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.