Environmental approval grantedBuildings & townships · Surat, Gujarat

Prince Elysium

Prince Elysium is an approved building project in Dabholi, Majura, Surat, Gujarat. The site covers 1.4 acres. Its stated project cost is ₹43.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Nov 2022).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Prince Elysium?

Prince Elysium is an approved building project in Dabholi, Majura, Surat, Gujarat. The site covers 1.4 acres.

Who is building it?

The applicant is Vaibhav Construction.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 26 Nov 2022), as of 27 Nov 2026.

Where is it?

In Dabholi, Majura, Surat, Gujarat.

How big is it?

It has a stated cost of ₹43.8 crore and a site of 1.4 acres.

When was it filed?

The application was filed on 26 Nov 2022.

Project details

StatusEnvironmental approval granted
Status since26 Nov 2022
Application filed26 Nov 2022
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantVaibhav Construction
Land area1.4 acres (0.6 ha)
Project cost₹43.8 crore
Village / localityDabholi
Taluk / tehsilMajura
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00102

What the filings say

What is planned

Prince Elysium is a proposed residential building project by Vaibhav Construction in Dabholi, Surat. According to the applicant's conceptual plan, the project will consist of three residential buildings, each rising to 14 floors above a hollow plinth and a basement. The development is designed to provide 168 residential units.

Infrastructural features planned for the society include a clubhouse, a children's play area, and a garden with a jogging park. The total built-up area for the project is 26,627.22 square metres, with a ground coverage of 1,378.62 square metres.

ItemDetail
Total Units168 Residential Units
Number of Buildings3 Blocks (A, B, and C)
Building Height44.95 metres
Tallest BuildingBasement + Hollow Plinth + 14 Floors
Expected Residents840 persons
Total Parking Area5,865.00 square metres
Total Parking Spaces192 Equivalent Car Spaces (ECS)

Layout and design

The three blocks are arranged around a central common plot. The basement, covering 4,442.04 square metres, is dedicated to parking and utility services. The ground level and hollow plinth are also utilized for parking and access. Residential units begin from the first floor and continue through the 14th floor. Each typical floor across the three blocks has a built-up area of approximately 466.86 to 475.18 square metres. The design incorporates refuge areas on the 6th, 9th, and 13th floors for fire safety.

Water, power and access

The project's water requirement during the operation phase is estimated at 71 kilolitres per day (KLD) of fresh water, supplemented by 50 KLD of recycled water for flushing and gardening, totaling 121 KLD. Water will be supplied by the Surat Municipal Corporation (SMC). A sewage treatment plant (STP) with a capacity of 100 KLD, using Moving Bed Biofilm Reactor (MBBR) technology, will be installed on-site. Treated sewage will be partially reused, with the remaining 44 KLD discharged into the SMC drainage line.

The estimated electrical load is 900 KW, to be sourced from Dakshin Gujarat Vij Company Limited (DGVCL). For backup, the applicant proposes one 125 KVA silent diesel generator set. Solar power will be integrated into the design, with a 90 KW rooftop solar system planned to power street lighting and common area lights.

Access to the site is provided via a 24-metre wide road. The layout includes two entry and exit gates and a 6-metre wide internal peripheral road for fire tender movement.

Environmental safeguards

The applicant has planned a green belt covering 600 square metres (0.06 hectares), which is approximately 10.72% of the plot area. This area will include 95 trees of various species such as Gulmohar, Jambu, and Limdo. For rainwater management, two recharging borewells are proposed to capture rooftop runoff and recharge the groundwater table.

Solid waste management will involve an organic waste convertor (OWC) with a capacity of 150 kg/day to process kitchen and garden waste into manure. Inorganic waste will be segregated and collected by the SMC. The project budget includes ₹5.70 crore for an Environmental Management Plan, covering the STP, fire fighting systems, and energy conservation measures.

Prince Elysium site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Prince Elysium: Site layout: building blocks, common plot, and internal roads (preview)🔒 Sign in free to see it
Site layout: building blocks, common plot, and internal roads
Prince Elysium: Basement floor plan: parking layout and exhaust ventilation details (preview)🔒 Sign in free to see it
Basement floor plan: parking layout and exhaust ventilation details
Prince Elysium: Building section and elevation showing 14 residential floors (preview)🔒 Sign in free to see it
Building section and elevation showing 14 residential floors
Prince Elysium: Typical floor plan for Blocks A and B (preview)🔒 Sign in free to see it
Typical floor plan for Blocks A and B

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 58% of them.

52 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dabholi, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.