Quick answers
What is this project?
Expansion For Proposed Project Synthetic Organic Chemicals (Resin-1000 Mt/annum) Manufacturing Unit Of M/s. Sagaply Industries LLP is an approved industrial project in Bhimasar, Anjar, Kachchh, Gujarat. The site covers 7.2 acres.
Who is building it?
The applicant is Sagaply Industries LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Nov 2022), as of 27 Nov 2026.
Where is it?
In Bhimasar, Anjar, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹4 crore and a site of 7.2 acres.
When was it filed?
The application was filed on 2 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Nov 2022 |
| Application filed | 2 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Sagaply Industries LLP |
| Land area | 7.2 acres (2.9 ha) |
| Project cost | ₹4 crore |
| Village / locality | Bhimasar |
| Taluk / tehsil | Anjar |
| District | Kachchh |
| State | Gujarat |
| Location from | Village |
| Our reference | WID-GJ-00176 |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.2 acres, this one is smaller than 81% of them.
Where it is
Bhimasar, Anjar, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fibre Pvt. Ltd. Laying of OFC line Route : Padana-Bhimasar Village… — forest land use approved, 1.1 km away
- Transfer of Environment Clearance titled "for manufacturing additional product… — environmental approval granted, 1.5 km away
- AMENDMENT IN ENVIRONMENTAL CLEARANCE for SYNTHETIC ORGANIC CHEMICALS… — under environmental review, 1.8 km away
- Environment Clearance for Proposed Synthetic Organic Chemicals Manufacturing… — environmental approval granted, 1.8 km away
- Environment Clearance for Proposed Synthetic Organic Chemicals Manufacturing… — cleared for impact study, 1.8 km away
- Proposed Synthetic Organic Chemicals Manufacturing Facility by M/s. Sidhe… — cleared for impact study, 1.8 km away
- Proposed Expansion Project for Manufacturing of Various Synthetic Organic… — environmental approval granted, 2.2 km away
- Industrial project by Shree Salasar Decor Pvt. Ltd. — environmental approval granted, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.