Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

Pushpak-2

Pushpak-2 is an approved building project in Odhav, Sabarmati, Ahmadabad, Gujarat. The site covers 1.2 acres. Its stated project cost is ₹36.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 21 Nov 2022).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since21 Nov 2022
Application filed21 Nov 2022
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantShivam Buildcon
Land area1.2 acres (0.5 ha)
Project cost₹36.4 crore
Village / localityOdhav
Taluk / tehsilSabarmati
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00177

What the filings say

What is planned

Shivam Buildcon proposes a new affordable housing project named "PUSHPAK-2" in Odhav, Ahmadabad. The applicant's project report describes a mixed-use development consisting of residential and commercial components across five blocks (Block A to Block E).

The project is planned to include a total of 259 units, comprising 249 residential units and 10 commercial units. The residential units are distributed across the blocks as follows:

Unit Details and Capacity

ItemDetail
Total Units259 (249 Residential, 10 Commercial)
Total FSI Area12,996.03 square metres
Total Built-up Area21,646.90 square metres
Maximum Floors10 Floors above ground
Common Plot Area601.71 square metres
Tree Plantation123 trees (proposed)
Percolating Wells2 units (proposed)

Layout and design

The layout features five distinct blocks arranged around a central common plot of 601.71 square metres. Block A is positioned along the 15.00-metre wide TPS road, housing the commercial shops on the ground floor. Blocks B through E are situated towards the interior of the plot.

The design includes a cellar level dedicated to parking and services. The ground floor (hollow plinth) is also utilised for parking and building foyers. Residential units are located from the first to the tenth floors. The project incorporates a terrace level with open spaces, stair cabins, and overhead water tanks.

Water, power and access

According to the Environmental Management Plan (EMP), the water requirement during the construction phase will be met through local water tanker suppliers. During the operation phase, water will be supplied by the Ahmadabad Urban Development Authority (AUDA). The applicant proposes a 200 kilolitres per day (KLD) sewage treatment plant (STP) using Activated Sludge Process technology. Treated water will be reused for gardening and toilet flushing.

Power will be sourced from the local grid, with a proposed 67 KW rooftop solar energy system. A diesel generator (DG) set with acoustic enclosures will be provided for emergency backup. Access to the site is provided via a 15.00-metre wide TPS road and a 9.00-metre wide TPS road. Internal roads are designed with a width of 7.5 metres to allow for fire tender movement.

Environmental safeguards

The applicant proposes several mitigation measures to manage environmental impact:

Timeline

The applicant states that construction expenses will commence in the year 2022, following the grant of environmental clearance. The implementation plan for capital expenditure for environmental management is spread across three years (2022-23 to 2024-25).

Pushpak-2 site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Pushpak-2: Site layout: blocks, roads, common plot and parking zones (preview)🔒 Sign in free to see it
Site layout: blocks, roads, common plot and parking zones
Pushpak-2: Cellar plan: parking layout and sewage treatment plant location (preview)🔒 Sign in free to see it
Cellar plan: parking layout and sewage treatment plant location
Pushpak-2: Floor plans: typical residential unit layouts and commercial shop details (preview)🔒 Sign in free to see it
Floor plans: typical residential unit layouts and commercial shop details
Pushpak-2: Location map: project site coordinates and Google Earth imagery (preview)🔒 Sign in free to see it
Location map: project site coordinates and Google Earth imagery

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 72% of them.

168 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Odhav, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.