Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Nov 2022 |
| Application filed | 22 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Savjibhai Sakhiya |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹50 crore |
| Village / locality | Raiya |
| Taluk / tehsil | Rajkot |
| District | Rajkot |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00188 |
In context
134 applications in Rajkot since January 2022 are in the same category (Buildings & townships): 109 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2 acres, this one is larger than 63% of them.
64 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raiya, Rajkot, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential cum Commercial Building Project 9th Emerland by Shree… — environmental approval granted, 100 m away
- Proposed residential building construction project Sundaram Garden City by… — under environmental review, 250 m away
- Proposed residential cum commercial building construction project The Royal… — initial checks, 950 m away
- Proposed Residential cum Commercial Project RK Prestige by Shree Atulbhai… — environmental approval granted, 1 km away
- Proposed Commercial Project The Capital by Ami Realinfra LLP — environmental approval granted, 1.2 km away
- Proposed Commercial Project The Capital by Ami Realinfra LLP — environmental approval granted, 1.2 km away
- Proposed Residential Cum Commercial Project by Vivan Buildtech LLP — environmental approval granted, 1.3 km away
- Proposed commercial building construction project RK Ultimate by Shri Alpesh… — initial checks, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.